Skip to main content

Adani-led consortium wins Chhattisgarh highway project

A consortium led by Adani Enterprises has won a US$175 million highway contract in Chhattisgarh from the National Highways Authority of India. Work in Chhattisgarh, one of India’s 29 states, will be done under a 15-year Hybrid Annuity Model and take nearly two years. Chhattisgarh is heavily forested with many rivers and dramatic waterfalls, making it one of India’s major supplier of hydro-electricity. The highways project involves four-laning a 53km stretch on the Bilaspur-Pathrapali section of the NH
April 10, 2018 Read time: 1 min
A consortium led by Adani Enterprises has won a US$175 million highway contract in Chhattisgarh from the 292 National Highways Authority of India.


Work in Chhattisgarh, one of India’s 29 states, will be done under a 15-year Hybrid Annuity Model and take nearly two years. Chhattisgarh is heavily forested with many rivers and dramatic waterfalls, making it one of India’s major supplier of hydro-electricity.

The highways project involves four-laning a 53km stretch on the Bilaspur-Pathrapali section of the NH-111, along with construction of a paved shoulder.

The deal is the Adani Group's first project in transport infrastructure, according to a report by India’s Business Standard newspaper.

For more information on companies in this article

Related Content

  • Canada: Champlain Bridge deal awarded to SNC-Lavalin consortium
    April 17, 2015
    The Canadian government has awarded a multi-billion dollar contract for the Champlain Bridge in Montreal, in the province of Quebec, to a consortium led by SNC-Lavalin. The firm, based in Montreal, will design, build, maintain and operate the toll bridge under a 35-year public-private partnership deal worth between US$2.5-$4.1 billion. The consortium called Signature on the Saint-Lawrence Group includes Spanish firms Dragados Canada and ACS Infrastructures and the US firm Flatiron Construction. Other
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • FCC Corredor de las Playas wins Panama Inter-American Highway deal
    November 21, 2017
    The consortium FCC Corredor de las Playas I has won the contract to widen the first section of the Inter-American Highway. FCC Corredor de las Playas I consists of FCC Construcción and CICSA – the infrastructures and construction division of the Grupo Carso. The Inter-American Highway will be widened along nearly 38km to six lanes between La Chorrera and Santa Cruz in the province of Panama Oeste in Panama at a cost of around US$543 million, according to the consortium. The project includes enlarging the