Skip to main content

Adani-led consortium wins Chhattisgarh highway project

A consortium led by Adani Enterprises has won a US$175 million highway contract in Chhattisgarh from the National Highways Authority of India. Work in Chhattisgarh, one of India’s 29 states, will be done under a 15-year Hybrid Annuity Model and take nearly two years. Chhattisgarh is heavily forested with many rivers and dramatic waterfalls, making it one of India’s major supplier of hydro-electricity. The highways project involves four-laning a 53km stretch on the Bilaspur-Pathrapali section of the NH
April 10, 2018 Read time: 1 min
A consortium led by Adani Enterprises has won a US$175 million highway contract in Chhattisgarh from the 292 National Highways Authority of India.


Work in Chhattisgarh, one of India’s 29 states, will be done under a 15-year Hybrid Annuity Model and take nearly two years. Chhattisgarh is heavily forested with many rivers and dramatic waterfalls, making it one of India’s major supplier of hydro-electricity.

The highways project involves four-laning a 53km stretch on the Bilaspur-Pathrapali section of the NH-111, along with construction of a paved shoulder.

The deal is the Adani Group's first project in transport infrastructure, according to a report by India’s Business Standard newspaper.

For more information on companies in this article

Related Content

  • New highway project in Rajasthan, India
    March 1, 2018
    Work is starting shortly on the construction of a new highway in India’s Rajasthan State. The highway project will be carried out by the contractor GHV (India) and the package of works was awarded by the National Highways Authority of India (NHAI). The work involves building a stretch of the NH-925A route that runs from Gagaria to Baori Kalan and on to Serwa-Bakhasar. This 197km section of NH-925A will form part of the highway from Sata to Gandhav, with the work costing close to US$175 million.
  • India rushing to improve its highway system
    February 9, 2012
    Despite the world economic slowdown, India still seems in a rush to improve its highway system as Patrick Smith reports. Later this year India will be seen by hundreds of millions worldwide when the country's capital New Delhi hosts its biggest event ever.
  • IRB Infrastructure Developers wins projects in India
    March 28, 2018
    A highway project worth US$153.5 million in India’s Tamil Nadu State will be handled by IRB Infrastructure Developers. The same firm will also build a 29km stretch of NH 45A between Viluppuram and Puducherry. A 38km section of NH 45A between Puducherry and Poondiyankuppam meanwhile will be built by Oriental Structural Engineers. These three contracts were all awarded by the National Highways Authority of India (NHAI).
  • India’s capital highway project will improve transport connections
    October 10, 2017
    Huge numbers of construction machines as well as plant and equipment are working overtime, backed by mammoth manpower, to meet the targeted completion deadline of March 2018 for India’s Eastern Peripheral Expressway (EPE). The 135km arterial route is being built with six lanes and surrounds India’s National Capital, Delhi, its National Capital Region (NCR) and the industrially developed North Indian states of Haryana and Uttar Pradesh.