Skip to main content

A6 project between Weinsberg and Wiesloch/Rauenberg set to start

Work will soon start on the €1.3 billion project to widen a stretch of the A6 motorway, one of Germany’s most congested highways. Both sides of the motorway between the Weinsberg and Wiesloch/Rauenberg junctions will be expanded. On 25 km of the section being expanded under the project – altogether 47.1 km – the number of lanes will be increased from four to six. The project also encompasses the construction of the 1.3km-long Neckartal Bridge. Preparatory work for the public-private partnership has
January 26, 2017 Read time: 2 mins
Work will soon start on the €1.3 billion project to widen a stretch of the A6 motorway, one of Germany’s most congested highways.

Both sides of the motorway between the Weinsberg and Wiesloch/Rauenberg junctions will be expanded.

On 25 km of the section being expanded under the project – altogether 47.1 km – the number of lanes will be increased from four to six. The project also encompasses the construction of the 1.3km-long Neckartal Bridge.

Preparatory work for the public-private partnership has already begun with project completion in about five and half years, in July 2022. Clients for the project are the Federal Ministry of Transport and Digital Infrastructure, the state of Baden-Württemberg and Stuttgart Regional Board.

The Federal Government, represented by the regional administrative council (Regierungspräsidium) of Stuttgart, had initially put the roadworks to public tender. This PPP project is designed as a business model type 'A' - or availability model – where the Federal Government makes payment to the private contractor based on the passability of the lanes.

Apart from construction work, the project involves operation and maintenance for the entire 47.1km section over 30 years. The bidding consortium ViA6West made up of the construction firms 981 Hochtief and 1249 Johann Bunte Bauunternehmung together with the financial investor 3634 DIF Infrastructure IV was awarded the concession to carry out the PPP project last October. Construction accounts for around €600 million of this total. Hochtief PPP Solutions has a 30% share in ViA6West, DIF has 50% and Johann Bunte holds 20%.

Consulting engineers Schüßler-Plan was leader of an interdisciplinary advisory team consisting of engineers, lawyers, financial service providers and business consultants. The team worked on conceptual design, consulting and management of the complex bidding procedure. Schüßler-Plan itself carried out economic feasibility studies.

Consulting engineers 1419 Arup provided technical due diligence for one of the bidders and the banks.

The project is qualified for the Juncker Plan under which the EIB –European Investment Bank - and the European Commission provide funds for infrastructure projects in order to overcome the current investment shortfall in Europe. KfW IPEX-Bank is offering a tranche as a project bond, which involves the project company placing the bond on the capital market.

For more information on companies in this article

Related Content

  • Odebrecht wins Brazilian highway concession
    November 29, 2013
    Odebrecht has been awarded a concession for Brazil’s important BR-163 federal highway route. The 851km section of highway runs through Mato Grosso state and the deal is worth some US$2 billion, according to a report by Business News Americas. As part of its contract, Odebrecht will have to widen a 454km stretch of the route within five years and is also required to build nine new toll booths.
  • Contractor Strabag reports strong performance
    April 30, 2013
    Austrian contractor STRABAG reports healthy earnings before interest and taxes (EBIT) of €207 million in 2012. This figure beats the firm’s own expectations and the expectations of the market. Net income after minorities stood at €61 million, showing an expected considerable decrease of 66.67% compared to the year before. “An output volume of €14 billion in 2012 – that’s nothing to complain about. With €13.2 billion, the end-of-the-year order backlog is also nearly exactly at the pre-crisis level of 2008, s
  • The Russian government is set to revise roadbuilding standards and technologies
    May 29, 2013
    The Russian government is considering revising standards and technologies of roadbuilding in the country, writes Eugene Gerden. The aim is to accelerate implementation of one of the major public projects in the transport industry of Russia in the coming years: expansion of the road network from the current 900,000km to 1.3 million km by 2030 as part of the current Russian State Transport Strategy. According to a recent study, conducted by analysts of the Presidential Head Control Directorate, maintaining th
  • Increased mobility for Mexico
    June 14, 2012
    Urban mobility is high on the infrastructure agenda in Mexico. Business News Americas spoke with Salvador Herrera, executive director of the Centre for Sustainable Transport (CTS), about the elements of a sustainable transport system and Mexico City's addiction to the car At the heart of Mexico City's transport policy is a contradiction that is typical of the country as a whole. The government is spending big on Line 12 of the metro system and has introduced the first Metrobús bus rapid transit (BRT) l