Skip to main content

Minimising the problems of construction disputes

*Nigel Grout discusses methods for minimising the risk of potential legal issues in construction projects Disputes and the construction industry are synonymous with each other. In a climate of economic downturn, the prevalence of major disputes will continue to be high as parties are unwilling or not able to compromise to reach a settlement. According to the latest ‘Global Construction Disputes’ report by EC Harris, the global average value of a construction dispute in 2012 was nearly US$32 million.
September 30, 2013 Read time: 4 mins
Disputes over factors such as the quality of completed roadworks can lead to torturous legal battles
*Nigel Grout discusses methods for minimising the risk of potential legal issues in construction projects

Disputes and the construction industry are synonymous with each other.  In a climate of economic downturn, the prevalence of major disputes will continue to be high as parties are unwilling or not able to compromise to reach a settlement. According to the latest ‘Global Construction Disputes’ report by 3449 EC Harris, the global average value of a construction dispute in 2012 was nearly US$32 million.

Typically, construction disputes involve claims for additional costs, late or non-payment, project delay and disruption to the works. Both contractors and employers regularly cite common causes. These include poor contract administration, not properly understanding the contract, failure to comply with contractual obligations, insufficient tender price, incomplete design, failure to give access or possession of the site, changes to works, differing site conditions and force majeure events.

Despite the propensity for disputes to occur, many international practitioners in dispute resolution consider that more could be done to avoid or minimise the impact of disputes. However, it is time for a more uniform approach to be adopted in international projects; an approach that includes the facility for dispute avoidance as well as dispute resolution.

For many years, arbitration and litigation have been the favoured forms of dispute resolution if negotiation between the parties fails. Despite their widespread use, a major problem with both these procedures is the excessive cost and length of time required to reach a conclusion, and these inherent problems show no signs of improving. Arbitration of significant disputes can often take between two and four years, and even this period of time compares favourably with litigation in many national court systems. Arbitration and litigation are also restrictive in that they are reactive rather than proactive, focusing entirely on the resolution of disputes after they have arisen, rather than trying to avoid disputes in the first place.

But many of the current problems associated with construction disputes could be addressed by a far wider global recognition and usage of standing Dispute Adjudication Boards. This type of Dispute Board is established at the start of a project, and apart from dispute resolution, one of its main roles is to help the contracting parties try and resolve issues before they become disputes. This is facilitated by the Dispute Board members being kept up to date with progress and developments, and visiting the site at regular intervals (typically every 3-4 months). During these visits the Dispute Board can observe any problems or potential problems first hand, and discuss matters of concern with both the Contractor and Employer. If required, the Dispute Board can also give informal advice and opinions.

The importance of dispute avoidance as well as dispute resolution is recognised by the World Bank and a number of major multilateral Development Banks, who include in their Standard Bidding Documents a mandatory requirement to establish a standing Dispute Board.  A similar requirement is also included by the International Federation of Consulting Engineers (FIDIC) in the latest editions of their Red, Gold and Pink Books, which are widely used conditions of contract on international projects.

Despite this widespread endorsement, there are many international projects where the contractual provision for standing Dispute Boards is either deleted, not implemented, or only implemented when a dispute occurs, losing the significant benefit of dispute avoidance. Inevitably, one of the main reasons for lack of use is cost. Whilst the Dispute Board is a very small percentage of the overall contract value, and is considerably less than the cost of arbitration or litigation, it is not an insignificant expense.

To encourage a far wider use of standing Dispute Boards, the major international funding institutions could follow the example set by the 2416 Japan International Cooperation Agency (JICA), by funding the whole process. Although many funding organisations stipulate a standing Dispute Board, they do not currently include the overall cost of the Dispute Board as part of their funding, nor do they make the establishment of a standing Dispute Board a condition to receiving full project funding. A change in policy from the funding banks would give borrowers far more reason to implement Dispute Boards. 

Recent improvements to the FIDIC conditions of contract for enforcing Dispute Board decisions are also likely to enhance their usage. In the event of a losing party failing to comply with a Dispute Board decision, the failure itself is now capable of being referred to arbitration for summary or other expedited relief, so any necessary enforcement should be achieved relatively quickly.

Disputes will clearly remain an integral part of construction life. But standing Dispute Boards with their facility for dispute avoidance as well as dispute resolution, and their savings in time and cost when compared to arbitration and litigation, are likely to play an increasing role in minimising the impact of construction disputes.

For more information on companies in this article

Related Content

  • India’s road to safety
    September 5, 2012
    India's growth rate is the envy of the world, and its infrastructure is rapidly improving, but its road safety record is the world's worst. Patrick Smith reports on a conference aimed at finding answers to the problems Ambling through the gardens and marble magnificence that is the Taj Mahal or gazing down on the city of Jaipur from the hilltop Jaigarh Fort is far removed from the world outside.
  • Construction corruption causes costs to climb
    December 21, 2012
    People are stealing our money ! According to the World Bank Report: “Curbing Fraud, Corruption and Collusion in the Roads Sector” June 2011. “…roads projects around the globe remain plagued by fraud, corruption and collusion…” In some countries, contractors are refusing to participate in tenders/bids because of the extent of corruption. I hope to encourage you to take action to fight Fraud and Corruption (FC). It is impossible to precisely know the extent of Fraud and Corruption. The reason is simple. If F
  • Balanced Mix Design in the US could revolutionise pavement design and testing
    April 30, 2018
    Roads in the US keep failing so the Federal Highways Authority is proposing a new approach to mix design, but what does this mean for tests and testing? - Kristina Smith reports How do you test an asphalt mix for rutting? In the US, the answer could be any one of several tests, depending on which State you are in: Asphalt Pavement Analyser, Flow Number, Hamburg Wheel Tracking Test, Superpave Shear Test or Triaxial Stress Sweep Test. But that could all change. The Federal Highways Agency (FHWA), part of
  • Preventive maintenance - preserving pavements
    February 14, 2012
    In the first article of a three-part series on preventive maintenance, Alan S. Kercher, of Kercher Engineering, highlights the value to road agencies of a properly implemented pavement preservation programme For many road agencies, the budget for maintenance, rehabilitation and reconstruction (MR&R) of their roads is focused mainly on the pavements that are in the worst condition. In the short term, this common approach may seem very logical. However, when focused on expensive structural improvements,