Minimising the problems of construction disputes

*Nigel Grout discusses methods for minimising the risk of potential legal issues in construction projects Disputes and the construction industry are synonymous with each other. In a climate of economic downturn, the prevalence of major disputes will continue to be high as parties are unwilling or not able to compromise to reach a settlement. According to the latest ‘Global Construction Disputes’ report by EC Harris, the global average value of a construction dispute in 2012 was nearly US$32 million.
September 30, 2013 Read time: 4 mins
Disputes over factors such as the quality of completed roadworks can lead to torturous legal battles
*Nigel Grout discusses methods for minimising the risk of potential legal issues in construction projects

Disputes and the construction industry are synonymous with each other.  In a climate of economic downturn, the prevalence of major disputes will continue to be high as parties are unwilling or not able to compromise to reach a settlement. According to the latest ‘Global Construction Disputes’ report by 3449 EC Harris, the global average value of a construction dispute in 2012 was nearly US$32 million.

Typically, construction disputes involve claims for additional costs, late or non-payment, project delay and disruption to the works. Both contractors and employers regularly cite common causes. These include poor contract administration, not properly understanding the contract, failure to comply with contractual obligations, insufficient tender price, incomplete design, failure to give access or possession of the site, changes to works, differing site conditions and force majeure events.

Despite the propensity for disputes to occur, many international practitioners in dispute resolution consider that more could be done to avoid or minimise the impact of disputes. However, it is time for a more uniform approach to be adopted in international projects; an approach that includes the facility for dispute avoidance as well as dispute resolution.

For many years, arbitration and litigation have been the favoured forms of dispute resolution if negotiation between the parties fails. Despite their widespread use, a major problem with both these procedures is the excessive cost and length of time required to reach a conclusion, and these inherent problems show no signs of improving. Arbitration of significant disputes can often take between two and four years, and even this period of time compares favourably with litigation in many national court systems. Arbitration and litigation are also restrictive in that they are reactive rather than proactive, focusing entirely on the resolution of disputes after they have arisen, rather than trying to avoid disputes in the first place.

But many of the current problems associated with construction disputes could be addressed by a far wider global recognition and usage of standing Dispute Adjudication Boards. This type of Dispute Board is established at the start of a project, and apart from dispute resolution, one of its main roles is to help the contracting parties try and resolve issues before they become disputes. This is facilitated by the Dispute Board members being kept up to date with progress and developments, and visiting the site at regular intervals (typically every 3-4 months). During these visits the Dispute Board can observe any problems or potential problems first hand, and discuss matters of concern with both the Contractor and Employer. If required, the Dispute Board can also give informal advice and opinions.

The importance of dispute avoidance as well as dispute resolution is recognised by the World Bank and a number of major multilateral Development Banks, who include in their Standard Bidding Documents a mandatory requirement to establish a standing Dispute Board.  A similar requirement is also included by the International Federation of Consulting Engineers (FIDIC) in the latest editions of their Red, Gold and Pink Books, which are widely used conditions of contract on international projects.

Despite this widespread endorsement, there are many international projects where the contractual provision for standing Dispute Boards is either deleted, not implemented, or only implemented when a dispute occurs, losing the significant benefit of dispute avoidance. Inevitably, one of the main reasons for lack of use is cost. Whilst the Dispute Board is a very small percentage of the overall contract value, and is considerably less than the cost of arbitration or litigation, it is not an insignificant expense.

To encourage a far wider use of standing Dispute Boards, the major international funding institutions could follow the example set by the 2416 Japan International Cooperation Agency (JICA), by funding the whole process. Although many funding organisations stipulate a standing Dispute Board, they do not currently include the overall cost of the Dispute Board as part of their funding, nor do they make the establishment of a standing Dispute Board a condition to receiving full project funding. A change in policy from the funding banks would give borrowers far more reason to implement Dispute Boards. 

Recent improvements to the FIDIC conditions of contract for enforcing Dispute Board decisions are also likely to enhance their usage. In the event of a losing party failing to comply with a Dispute Board decision, the failure itself is now capable of being referred to arbitration for summary or other expedited relief, so any necessary enforcement should be achieved relatively quickly.

Disputes will clearly remain an integral part of construction life. But standing Dispute Boards with their facility for dispute avoidance as well as dispute resolution, and their savings in time and cost when compared to arbitration and litigation, are likely to play an increasing role in minimising the impact of construction disputes.

For more information on companies in this article

Related Content

  • Industry consultation delivers draft ITS strategy for Australia
    April 24, 2012
    A draft National ITS Industry Strategy developed through extensive industry and government stakeholder consultation has been released for public comment by ITS Australia. It encompasses road, rail, sea and air transport from 2012 to 2017. Its purpose is to improve the safety, economic and environmental performance of Australia's transport networks by capitalising on state of the art ITS technologies and integrating those technologies across the networks. ITS Australia CEO Susan Harris said the strategy f
  • Global growth in machine rental
    May 20, 2015
    The machine rental sector is undergoing significant expansion worldwide – Dan Gilkes reports. Plant hire, equipment rental, leasing, call it what you will, being able to use a machine when and where you need it, with no further concerns relating to ownership costs, depreciation or sudden repair bills, remains a compelling argument for many contractors. Which is one of the main reasons for the continued growth in popularity of equipment rental across the world. Rental has been big business in the UK, the US
  • Trading on carbon markets
    August 2, 2012
    Anticipating new trends, IRF is organising a panel discussion on this promising and fast-growing market during the 2nd International Roads & Environment Conference Signing the declaration on Energy, Security and Climate Change in Hokkaido, Japan, during the last G8 meeting, 17 leaders of the world's major economies have underlined the potential of appropriate market mechanisms when looking for global solutions in the fight against climate change. Emissions' trading is one of the options and certainly the in
  • EU must do more to cut car occupant deaths, say transport safety campaigners
    April 25, 2014
    Transport safety campaigners are calling on the European Union to accelerate progress on reducing the number of people killed in cars annually in the EU, as new research shows 12,345 car occupants died in 2012. The report into trends in car occupant safety, published today (29 April 2014) by the European Transport Safety Council (ETSC), claims that 900 lives could be saved every year in the EU if car manufacturers were required to fit seat-belt reminder sensors to front and rear passenger seats to help prev