Skip to main content

Dubai machine sale for Euro Auctions

A major auction of construction machines has been carried out successfully in Dubai by the specialist firm Euro Auctions The firm says that it has consolidated its Middle East position with its second Dubai sale. According to Euro Auctions, the firm saw increases in buyers and vendors at the one-day plant and machinery sale. The company held its first Dubai auction in September and has now carried out a successful follow-up event that attracted more buyers and vendors. The firm saw an increase in the
May 11, 2018 Read time: 3 mins
The auction attracted a large number of bidders and buyers
A major auction of construction machines has been carried out successfully in Dubai by the specialist firm Euro Auctions


The firm says that it has consolidated its Middle East position with its second Dubai sale. According to 214 Euro Auctions, the firm saw increases in buyers and vendors at the one-day plant and machinery sale.

The company held its first Dubai auction in September and has now carried out a successful follow-up event that attracted more buyers and vendors.

The firm saw an increase in the number of bidders opting to attend the second sale of more than 40%. The firm now has a permanent site in Dubai and the sale also saw a jump in the total number of successful buyers. There were also new vendors consigning equipment to this event for the first time.

Over 400 lots went under the hammer in a packed day, attracting strong interest from right across the Middle East as well as from India, Western Europe and Russia. Almost US$2 million of all sales were snapped up by United Arab Emirates-based bidders with significant purchases also going to Oman and Saudi Arabia.  Europe accounted for a further $700,000 of the total hammer prices with key consignments going to bidders in Germany, the Netherlands and the UK. Floor sales on the day accounted for the vast majority of business with just over 20% being transacted online, suggesting that a physical presence in the region is important to meet local demand.

“We are absolutely delighted about how this sale has gone, firmly placing our Dubai operation in the region and on the calendar,” said Jonnie Keys, Euro Auctions’ commercial manager. “News on our recent arrival in the region and our ambition to be a professional and key player in the used construction equipment sector is certainly getting out and stimulating much discussion. We’re also now signing up a number of the key equipment holders across the region as they look to use our facilities moving forward.”

Notable lots that went under the hammer at the recent Dubai sale included an unused 2016 2394 Volvo EC210BLC excavator which went for $75,000; Telehandlers and loaders were also in good supply with a 2008 255 JCB 540-170 selling for $43,000, while a low hours 2015 2294 CAT 966 went for $147,500.   


Euro Auctions leased a 91,000m² site in the Jebel Ali Free Zone that includes a purpose built auction complex covering over 3,000m² with a 360-seat, fully air-conditioned enclosed auction arena as well as ancillary buildings, workshops and infrastructure. Euro Auctions has all the necessary services and logistic licences in place for the new venture and will trade under the Euro Auctions brand.

Keys added, “Having a permanent presence in the region is both opening the door to many new buyers and sellers and enabling us to better link together our global operations so we can offer a complete service and sell equipment in the markets where they are most desired and where they will achieve the best prices possible.  Having a strong sales and support team here on the ground in Dubai, backed up by our international operations, has been a key factor in our success and was a key part of our growth plans for 2017 along with founding our successful operation in Hong Kong.”

For more information on companies in this article

Related Content

  • Highway 407 Revisited – smart tollroad extension
    June 7, 2016
    In the late 1990s, World Highways published a supplement on construction of Canada’s Highway 407, the world’s first all-electronic toll road. But how successful has it been? David Arminas reports from Toronto The head office for 407 ETR Concession Company is a low-rise building next to exit 59, just north of Toronto, Canada’s economic powerhouse. The building may be non-descript but inside is the advanced technical heart of Highway 407 ETR – Express Toll Route. It houses the latest toll monitoring techno
  • The March of the Urban Low-emission Zone
    April 17, 2018
    Europe’s political patchwork is getting a low-emission zone overlap, according to Malcolm Kent* By now, pretty much everybody in the industry will be aware of the Low Emission Zone in London, UK. But awareness of similar European zones about to start or expand might be more patchy. The background to all of these schemes is the problem of air quality, particularly European Union rules setting limits on acceptable pollution levels. It was found some years ago that several member states’ cities, including
  • Major success for bC India despite challenging economic conditions
    April 4, 2013
    Despite challenging times, the second bC India construction equipment show proved a success Mumbai, India’s most populous city and the fourth most populous in the world, has again delivered a successful bC India. The bauma/ConExpo international trade fair for construction machinery, building material machines, mining machines and construction vehicles, was held at the Bandra Kurla Complex, and impressively strengthened its position in the Indian market despite the challenging situation in the industry. Duri
  • Multiple milling machines removing surface
    April 24, 2019
    Milling subcontractor Pavement Recycling Systems removed thousands of tonnes of reclaimed asphalt pavement (RAP) from a runway at Oakland International Airport in California recently. The firm used a fleet of six Wirtgen W 210i cold milling machines to remove the asphalt in less than 60 hours from Runway 12-30, along the shore of San Francisco Bay. In total, 47,000tons of asphalt were milled within a 60-hour time frame, nonstop day and night, plus a single-shift second phase a week later. The firm start