Skip to main content

Chinese expansion for Bomag

Boppard-based BOMAG is boosting its production line in China for the second time. At the same time as the expansion of the plant, a newly built training centre has also been opened, with both moves intended to allow the firm continued growth in the region.
June 18, 2012 Read time: 2 mins

Boppard-based 172 Bomag is boosting its production line in China for the second time. At the same time as the expansion of the plant, a newly built training centre has also been opened, with both moves intended to allow the firm continued growth in the region.

Since 2002, BOMAG has been represented in China by its own subsidiary and factory and in 2006 this became a 100% BOMAG subsidiary. By this time, however, the factory in Fengxian, near Shanghai, which opened in 2002, had already become too small, so BOMAG began building a new facility not far from the old site. By 2007, a new plant was constructed at a new site in Fengxian. However, this plant's capacity was soon to run out due to the increasing turnover in China and the Asian region and, in 2011, the company therefore began extending production once again. The existing plant was extended and a new training centre was added at the same time. Both were officially opened on schedule at the end of February 2012. In 2010, BOMAG took over BOMA, its year-long dealer in China, which means that it now has its own sales network on the Chinese market, as well as a large-scale production facility and a training centre.

For more information on companies in this article

Related Content

  • XCMG boosting capacity
    January 6, 2017
    Increased manufacturing capacity has been a key focus for XCMG in recent years, with the firm having committed to upgrading its production facilities. XCMG has invested heavily in new manufacturing capacity for its ranges of cranes and wheeled loaders and both the Heavy Machinery and Wheeled Loader divisions now have new factories. The heavy crane facility produces machines in the 90tonne category and above and all production moved to the new plant in 2012 as the old factory was too small. The new facility
  • XCMG boosting capacity
    November 26, 2012
    Increased manufacturing capacity has been a key focus for XCMG in recent years, with the firm having committed to upgrading its production facilities. XCMG has invested heavily in new manufacturing capacity for its ranges of cranes and wheeled loaders and both the Heavy Machinery and Wheeled Loader divisions now have new factories. The heavy crane facility produces machines in the 90tonne category and above and all production moved to the new plant in 2012 as the old factory was too small. The new facility
  • Worldwide machine sales growing
    July 18, 2012
    Steady growth in machine sales reflects global demand for construction equipment - Mike Woof reports Keynote speakers at the UK’s Construction Equipment Association (CEA) recent annual general meeting revealed steady demand for new machines worldwide. Although Europe’s economy remains troubled, worldwide machine sales are strong and exports are providing huge turnover for manufacturers. Colin Timms of Off-Highway Research said that global equipment sales last peaked in 2007 at $98 billion, falling to $55 b
  • LiuGong is investing in its facilities and product line
    January 6, 2017
    The acquisition of the HSW firm making the Dressta bulldozers has been strategically important for LiuGong. This facility is its first factory in Europe and has brought with it a very well-proven product line. The factory has benefited from a number of changes and David Beatenbough, vice president of LiuGong research and development said, “What we’ve found is that every machine tool is old but the maintenance has been tremendous. We’ve only had to replace one or two machine tools. So for this year we’ve bee