Skip to main content

Power supply deal for Volvo Penta in Lebanon

Volvo Penta has supplied the first of its new power generation engines to its long-term business partner, Khonaysser Motors. The TWD1645GE engine was then installed in a prototype genset by the Lebanese genset manufacturer. This unit was field-tested by two of Khonaysser’s customers and one year later, the product has proven to be a success. When Lebanese electricity supply company Ishtirak El Hassan needed additional power sources to keep up with demand, it was eager to field-test the new genset from Khon
June 25, 2018 Read time: 2 mins
The Volvo Penta engines have proven successful in a generator application
Volvo Penta has supplied the first of its new power generation engines to its long-term business partner, Khonaysser Motors. The TWD1645GE engine was then installed in a prototype genset by the Lebanese genset manufacturer. This unit was field-tested by two of Khonaysser’s customers and one year later, the product has proven to be a success.


When Lebanese electricity supply company Ishtirak El Hassan needed additional power sources to keep up with demand, it was eager to field-test the new genset from Khonaysser Motors. With an unstable mains electricity supply, Lebanon is frequently subjected to power cuts. To ease the burden, Ishtirak El Hassan uses gensets to produce electricity for a range of customers including small companies. The company began field-testing the new genset equipped with 783 Volvo Penta’s latest power generation diesel engine, the TWD1645GE, in 2017. The firm was impressed with the unit’s performance and actually wanted to retain it once the agreed test period was complete.

The gensets need to be able to operate for up to 24 hours continuously, and more than 6,500 hours/year. Ishtirak El Hassan needed a genset with a high-performance engine, and the 16litre TWD1645GE has a high power density for its class.

Because the unit performed so well, the customer opted to buy one of the engines once the test period was complete. The Middle East is a big market for gensets due to difficulties in the supply of mains electricity. According to Beirut-based Khonaysser Motors, the engines have performed well and the dual-circuit cooling system is perfectly adequate for the local climatic conditions. Since the tests were completed, the firm says it has supplied several of the generator sets to customers. Key features of the new engine include its ability to cope with harsh environments, its compact design and low fuel consumption.

For more information on companies in this article

Related Content

  • John Deere offering innovative low emission engine solution
    April 13, 2012
    John Deere intends to use a package of technologies in its new diesels to achieve the low emissions performance required for Tier 4 Final/Stage IV compliance in the US and Europe. The regulations maintain the strict particulate matter (PM) emission levels established by Interim Tier 4/Stage III B regulations, while requiring an additional 80% reduction in nitrogen oxides (NOx). To meet Final Tier 4/Stage IV emissions regulations in some power categories, John Deere has developed what it calls the Integrated
  • Developments in road stabilisation machines
    February 14, 2012
    Road stabilisers play an important role for road recycling, with new machines coming to market - Mike Woof writes The reclaimer/stabiliser is becoming a much more important machine in roadbuilding applications now that the construction market is increasing its use of road recycling. The reclaimer/stabiliser used to be a niche machine offered by specialist manufacturers such as CMI, which was a pioneer of the concept. However in recent years this type of machine has become an important construction tool,
  • Volvo machines help construct new Norwegian tunnels
    January 12, 2015
    Close to Larvik in Norway’s Vestfold County and around 80km south of Drammen, two tunnels are currently under construction as part of a state-funded infrastructure development programme. The project, which began earlier this year, comprises 7km of four lane highway – part of the E18 major route – linking the towns of Bommestad and Sky. This includes the new Larvik and Matineå tunnels, which will span 2.8 and 1.3km respectively. Worth €187 million, this project was awarded to Skanska Norway, the second la
  • The Path to Climate-Neutral Road Construction
    October 1, 2023
    Machine manufacturers and construction companies around the globe are currently searching for ways to achieve the goal of climate-neutral construction. The challenge here is to successively reduce emissions of CO2 and other harmful gases (summarized to CO2 equivalents: CO2e) around the world to zero over the coming decades. In the road construction sector, this transformation is inextricably linked to the improvement and further development of production and working processes. In the future, machines and construction materials will also be assessed based on the climate-harmful emissions arising from their production and use. However, the focus should not be on individual machines, but on the entire process leading up to the finished product – a road. Ultimately, the decisive factor is the emissions generated per kilometer of newly built or rehabilitated road – the “CO2e per work done”.