Skip to main content

Power supply deal for Volvo Penta in Lebanon

Volvo Penta has supplied the first of its new power generation engines to its long-term business partner, Khonaysser Motors. The TWD1645GE engine was then installed in a prototype genset by the Lebanese genset manufacturer. This unit was field-tested by two of Khonaysser’s customers and one year later, the product has proven to be a success. When Lebanese electricity supply company Ishtirak El Hassan needed additional power sources to keep up with demand, it was eager to field-test the new genset from Khon
June 25, 2018 Read time: 2 mins
The Volvo Penta engines have proven successful in a generator application
Volvo Penta has supplied the first of its new power generation engines to its long-term business partner, Khonaysser Motors. The TWD1645GE engine was then installed in a prototype genset by the Lebanese genset manufacturer. This unit was field-tested by two of Khonaysser’s customers and one year later, the product has proven to be a success.


When Lebanese electricity supply company Ishtirak El Hassan needed additional power sources to keep up with demand, it was eager to field-test the new genset from Khonaysser Motors. With an unstable mains electricity supply, Lebanon is frequently subjected to power cuts. To ease the burden, Ishtirak El Hassan uses gensets to produce electricity for a range of customers including small companies. The company began field-testing the new genset equipped with 783 Volvo Penta’s latest power generation diesel engine, the TWD1645GE, in 2017. The firm was impressed with the unit’s performance and actually wanted to retain it once the agreed test period was complete.

The gensets need to be able to operate for up to 24 hours continuously, and more than 6,500 hours/year. Ishtirak El Hassan needed a genset with a high-performance engine, and the 16litre TWD1645GE has a high power density for its class.

Because the unit performed so well, the customer opted to buy one of the engines once the test period was complete. The Middle East is a big market for gensets due to difficulties in the supply of mains electricity. According to Beirut-based Khonaysser Motors, the engines have performed well and the dual-circuit cooling system is perfectly adequate for the local climatic conditions. Since the tests were completed, the firm says it has supplied several of the generator sets to customers. Key features of the new engine include its ability to cope with harsh environments, its compact design and low fuel consumption.

For more information on companies in this article

Related Content

  • Turning the construction industry green
    July 19, 2023
    Green is good for industry – delivering sustainability can also help reduce costs for construction firms, ensuring better financial performance
  • Hatz Diesel reduces frictional losses and boosts fuel efficiency
    January 6, 2017
    Hatz has boosted diesel engine efficiency with an all-new four-cylinder 2litre platform that combines low weight with low fuel consumption and meets Tier 4 Final/Stage IV emissions regulations without the need for a DPF. Called the 4H50TIC, the new engine uses two-valve cylinder head design to cut frictional losses, while opting for lower injection pressures of 1,800bar to contribute towards improved fuel efficiency.
  • Hatz Diesel reduces frictional losses and boosts fuel efficiency
    April 17, 2013
    Hatz has boosted diesel engine efficiency with an all-new four-cylinder 2litre platform that combines low weight with low fuel consumption and meets Tier 4 Final/Stage IV emissions regulations without the need for a DPF. Called the 4H50TIC, the new engine uses two-valve cylinder head design to cut frictional losses, while opting for lower injection pressures of 1,800bar to contribute towards improved fuel efficiency.
  • Latest VMS keeps world’s motorists moving safely
    April 10, 2013
    VMS for what is thought to be the longest road tunnel in the Middle East, and the installation of the latest VMS technology in Canada’s oldest national park to help motorists travelling through it are among the projects discussed by Guy Woodford. A large volume of VMS from Italian firm Solari has been installed in the new 4.2km-long Zayed Street Tunnel in Abu Dhabi – thought to be the longest in the Middle East. The Solari VMS supply consisted of 204 lane control signs, with Red, Yellow and Green LED pre-de