Skip to main content

Perkins Platinum Protection extends warranty for up to five years

Perkins Platinum Protection is an extended warranty package that has been introduced for new Perkins engines. With a flexible structure, the Platinum Protection scheme is available from two to five years duration, and for up to 5,000hours, offering comprehensive cover for up to 100% of components. Perkins said the warranty covers OEMs from unexpected repair bills and cover must be upgraded before the standard engine warranty expires.
April 20, 2016 Read time: 1 min

299 Perkins Platinum Protection is an extended warranty package that has been introduced for new Perkins engines.

With a flexible structure, the Platinum Protection scheme is available from two to five years duration, and for up to 5,000hours, offering comprehensive cover for up to 100% of components. Perkins said the warranty covers OEMs from unexpected repair bills and cover must be upgraded before the standard engine warranty expires.

All videos

For more information on companies in this article

Related Content

  • Versatile new mixer/pump unit from Blastcrete
    January 6, 2015
    Blastcrete Equipment claims that its RMX-5000 mixer/pump offers 15% more pumping pressure than any other machine in its class. The RMX-5000 is one of five mixer/pumps in Blastcrete’s lineup for refractory, shotcrete and concrete repair and is said to be user-friendly, safe and rugged enough to handle demanding installations. The efficient unit is available with either a spiral mixer or a paddle mixer with a planetary gearbox. The spiral mixer is designed for conventional shotcrete in applications such as br
  • Ambitious road tunnelling projects around the world
    November 29, 2013
    The construction of the world’s longest subsea road tunnel in Norway and a vital new link under the Bosphorus Strait in Turkey are among a host of exciting, major road tunnel-based projects currently being undertaken across the globe. Guy Woodford reports Sandvik DTi series tunnelling jumbos are being used for the excavation of Solbakktunnel, set to become the world’s longest subsea road tunnel.
  • Erlau’s Sideflex tyre protection system deflects rock debris away from tyres
    January 6, 2017
    Identifying the cost and downtime caused by damaged sidewalls on dumptrucks used in mining and quarry applications, Erlau has developed the Sideflex tyre protection system, which is claimed to be capable of deflecting rock debris away from tyre walls. Using bolt-on segments that form an Armadillo-like layer of protection covering the outer sidewall of an earthmoving tyre, Sideflex affords high-speed use, unlike traditional tyre chain protection systems, which offer limited speeds in use. “Comprehensive tyre
  • Erlau’s Sideflex tyre protection system deflects rock debris away from tyres
    April 18, 2013
    Identifying the cost and downtime caused by damaged sidewalls on dumptrucks used in mining and quarry applications, Erlau has developed the Sideflex tyre protection system, which is claimed to be capable of deflecting rock debris away from tyre walls. Using bolt-on segments that form an Armadillo-like layer of protection covering the outer sidewall of an earthmoving tyre, Sideflex affords high-speed use, unlike traditional tyre chain protection systems, which offer limited speeds in use. “Comprehensive tyre