Skip to main content

Perkins extends Syncro engine range

Perkins extended its compact engine platform, the Syncro range, at CONEXPO-CON/AGG. Its arrival means the range is bolstered by a 1.7litre version, which sits beneath the 2.8 and 3.6litre capacities introduced last year.
March 8, 2017 Read time: 2 mins
Perkins Syncro range now gets a 1.7litre, 29kW engine

299 Perkins extended its compact engine platform, the Syncro range, at CONEXPO-CON/AGG. Its arrival means the range is bolstered by a 1.7litre version, which sits beneath the 2.8 and 3.6litre capacities introduced last year.

Power is 29kW, and the three-cylinder, turbocharged, DOC-only engine avoids the use of after-cooling so it maintains its focus on compact packaging, to appeal to OEMs looking to downsize and increase power density within existing applications.

“We’ve carried out a lot of collaborative engineering with OEMs to determine their exact requirements for compact power units,” said Oliver Lythgoe, who is responsible for product concept marketing at Perkins.

He added that a new process of EGR management used on the Syncro range involves piping the spent gases through the cylinder head before reaching the intake valve. It is a development that prevents over-cooling of gases and the unwanted production of condensate, yet it offers enough temperature drop to reduce the impact on existing cooling systems.

“The Syncro product represents the very best of Perkins innovation,” Lythgoe said. “With a revised combustion process, we are producing a much cleaner burn, which reduces the amount of work that the after-treatment system is required to do.”

For more information on companies in this article

Related Content

  • MOBA technology used on key Russian highway
    May 30, 2013
    The Kaliningrad motorway Primorsk Ring is one of the prestige projects under construction within the scope of infrastructure improvements in the Russian exclave. With a total length of around 180kms, of which 81kms are motorway, the ring road will encircle the 500,000 residents of Kaliningrad city in a broad arc around the Samland peninsula. Completion of the US$32.55 million (1bn RUB) project is scheduled for 2015 and should allow comfortable travel for residents, tourists and football fans travelling to t
  • What’s new and what’s next in sustainable asphalt production
    May 10, 2021
    Maximising sustainability is a key driver in asphalt production as Dr Hans-Friedrich Peters at Ammann believes
  • Komatsu launches nextgen Dash 11 loaders
    June 24, 2025
    At the heart of new Dash 11 generation wheeled loaders is a newly developed Komatsu diesel engine.
  • MOBA’s World Cup highway mission
    April 23, 2013
    The Kaliningrad motorway Primorsk Ring is one of the prestige projects under construction within the scope of infrastructure improvements in the Russian exclave. With a total length of around 180kms, of which 81kms are motorway, the ring road will encircle the 500,000 residents of Kaliningrad city in a broad arc around the Samland peninsula.