Skip to main content

Kennametal unveils new retainers

Kennametal has introduced new retainers for its line of TSC step-shank tools used on large-track trenchers. The new retainers, designated TR3, have a patented design that enables them to be installed and removed easily and quickly. The flush style of the TR3 also employs three tabs, or 'ears' that are twice as thick as previous designs, ensuring a more secure fit into the block and contributing to the speedy installation and removal. Steve Lantz, Kennametal's trenching accounts manager, said: "These retaine
July 16, 2012 Read time: 2 mins
2365 Kennametal has introduced new retainers for its line of TSC step-shank tools used on large-track trenchers. The new retainers, designated TR3, have a patented design that enables them to be installed and removed easily and quickly.

The flush style of the TR3 also employs three tabs, or 'ears' that are twice as thick as previous designs, ensuring a more secure fit into the block and contributing to the speedy installation and removal.

Steve Lantz, Kennametal's trenching accounts manager, said: "These retainers are for the massive track trenching machines doing big projects. The operators of these machines want their tools to stay in place for as long as possible, and when they do need to be changed, they want to do it quickly to minimise downtime. The TR3 retainers address those requests from the field."

Applications for the TSC step shank tools, for which the TR3 retainers are designed, range from soft cutting to heavy-duty
rock cutting.

For more information on companies in this article

Related Content

  • In control, with advanced technology
    August 15, 2019
    Machine control technology continues to advance, with new systems offering contractors major gains in working efficiency The latest developments in machine control technology once again push the bar in terms of advancements. The latest systems allow contractors to work even more effectively and efficiently than before. Doosan has unveiled one of the first uses globally of 5G technology to remotely control construction and quarrying machines. The firm has coined the term ‘TeleOperation’ to describe the
  • An array of crushing and screening innovations was presented at the recent INTERMAT 2012 exhibition
    July 19, 2012
    The crushing and screening phase is a crucial component in aggregate production and new development will help optimise performance - Mike Woof reports Crushing and screening is a key part of the quarrying cycle and has a huge impact on overall operating performance. Optimising operations will cut running costs, reduce materials wastage and also provide a more consistent product quality, boosting cost-effectiveness dramatically. An array of innovations were revealed to the market at the recent INTERMAT 2012
  • Trimble’s vision of a far more efficient future
    July 5, 2021
    Trimble is offering a future with more efficient, optimised construction operations for faster project delivery
  • Concrete paving key to Berlin's airport runways
    February 17, 2012
    High production concrete paving is proving a key feature at the new Berlin airport facility currently under construction The new Berlin-Brandenburg International Airport will soon provide improved links by air to the city. Work started in mid 2006 with the redevelopment of the existing Berlin Schönefeld Airport.