Skip to main content

Magnetic filtration units increase efficiency

One of the USA’s largest and best-known dealers for Caterpillar off-road vehicles, Whayne Supply, has teamed up with a small UK engineering company, Magnom, to introduce magnetic filtration units that have been shown to increase operational efficiency and decrease downtime.
February 21, 2012 Read time: 2 mins
Caterpillar off-road vehicles dealer, Whayne Supply, has teamed up with small engineering company Magnom
One of the USA’s largest and best-known dealers for 178 Caterpillar off-road vehicles, 1467 Whayne Supply, has teamed up with a small UK engineering company, 1468 Magnom, to introduce magnetic filtration units that have been shown to increase operational efficiency and decrease downtime.

The filtration units, which remove ferrous particles, are being used in conjunction with traditional barrier techniques to provide “unmatched levels of filtration on the vehicles.”

The custom-designed units, using patented Magnom technology, are now in volume production.

Magnom engineers, led by the company’s technology director and original inventor Jobey Marlowe, worked with Whayne Supply over a three-year period to develop the custom units for the Caterpillar vehicles.

Whayne Supply focuses on the Kentucky and southern Indiana markets and is marketing the new filters to other North American Caterpillar dealers.

The company’s technology division general manager Edwin Downer said: “During testing, we were convinced by the results that adding Magnom units to the machine systems would reduce both operating expenses and unscheduled downtime.”

Magnom chairman Robert Spender said: “It is especially pleasing to us to be working with a partner that has the resources to introduce the benefits of Magnom technology to a wider audience. These benefits quickly translate into reduced warranty and general maintenance costs and so we are quietly confident of take up across North America.”

Magnom units are said to have an exceptionally long life and a design which enables them to capture a surprisingly large mass of ferrous material, filtering particle sizes down to 0.07µ (1µ or micron is equal to one millionth of a metre), while never impeding fluid flow.

For more information on companies in this article

Related Content

  • Southeast Asia’s cutting-edge asphalt production
    April 1, 2014
    An eye-catching state-of-the-art asphalt plant is making a big impact in South East Asia, while other new and proven asphalt plant technology remains in demand in Europe and other continents. Guy Woodford reports Marini China has ventured out of its traditional Chinese market to deliver to a Singaporean customer what is claimed to be Asia’s largest asphalt plant. An impressive 45m tall and capable of producing 360tonnes/hour, the plant model was in response to Ley Choon Group’s request for a new plant ahead
  • Using breakers to demolish redundant overpass
    December 11, 2015
    A demolition job in California was carried out successfully using a hydraulic breaker fitted to an excavator. An overpass on Highway 91 in Southern California had to be removed, with the contractor opting to use a hydraulic breaker for the job. The work was carried out within the 22-hour possession period set by the local authorities, allowing the route to reopen to traffic on time and minimising transport delays. The work was carried out safely and precisely, due to the use of suitable equipment. The re
  • Machine Control sector is the place for acquisitions
    January 22, 2014
    The machine control sector has been lively in recent months with a major acquisition, the unveiling of new software innovation and landmark testing of new technology to monitor paving temperature. Guy Woodford reports The state road construction authority in the German state of Saxony-Anhalt (LSBB Saxony-Anhalt) has become the first nationally to test MOBA’s new PAVE-IR Scan temperature measurement system at a works site.
  • 'Soft' option gets results
    February 8, 2012
    Soft engineering techniques, used to prevent soil erosion and stabilise steep cuts and embankments, have allowed engineers to successfully widen the M1 motorway in the UK. Over the 50km length of the work (25km northbound, 25km southbound) on a busy section of the motorway near the city of Nottingham, a total of 48km of slopes had to be modified, split roughly between cutting and embankment. The UK Highways Agency requirements for the work meant that wholesale widening of the corridor was not possible: the