Skip to main content

Engine firm Deutz is celebrating 150th anniversary

Engine manufacturer Deutz is celebrating its 150th anniversary. The company was established on the 31st March 1864 and was the world's first engine factory. Its history is closely linked with the development of the internal combustion engine with the four stroke ‘Otto’ cycle being developed in 1876. Today the Cologne-based company employs around 4,000 people and has a presence in over 130 countries. The atmospheric gas-powered engine, the four-stroke engine and low-voltage magneto ignition are technical inn
April 3, 2014 Read time: 1 min
Deutz has its own engine museum which includes some of the earliest internal combustion engines still in existence
RSSEngine manufacturer 201 Deutz is celebrating its 150th anniversary. The company was established on the 31st March 1864 and was the world's first engine factory. Its history is closely linked with the development of the internal combustion engine with the four stroke ‘Otto’ cycle being developed in 1876. Today the Cologne-based company employs around 4,000 people and has a presence in over 130 countries. The atmospheric gas-powered engine, the four-stroke engine and low-voltage magneto ignition are technical innovations that have revolutionised drive technology and were all developed by Deutz. The influential figures featuring in the firm’s history include Nicolaus August Otto, Eugen Langen, Gottlieb Daimler, Wilhelm Maybach and Ettore Bugatti.

For more information on companies in this article

Related Content

  • Hatz Diesel develops bolt-on DPF for L and M series engines
    April 17, 2013
    Hatz has revised its three and four cylinder L and M series air-cooled engine packages to comply with emissions regulations by including a cooled EGR system, DOC and DPF with active regeneration. The exhaust after-treatment package can be remote-mounted, said Hatz, and brings a 2dB(A) reduction in exhaust noise to the air-cooled engine.
  • Emissions legislation driving machinery design
    June 13, 2012
    Legislative and economic factors are impacting upon the earthmoving equipment market - Mike Woof reports No-one who has any connection with the construction equipment sector can have failed to notice that increasingly tough emissions legislation has changed the shape of machines over the last 10 years or so. A series of targets have been set and met with regard to the exhaust emissions permitted from off-highway machines used in North America and Europe. The latest round of requirements has seen the intr
  • Flyover and tunnel planned for D3 route in Slovakia
    February 13, 2015
    In Slovakia plans are in hand for work to the D3 route that will involve the construction of a flyover, a bridge and a tunnel. The flyover lies on the stretch of D3 between Zilina/Strazov and Zilina/Brodno. Work on this 4.25km section of the D3 is costing close to €255 million. The construction work commenced in June 2014 and is due for completion by 2017. The work is complex and includes building flyover over the Hricovska Prehrada Dam, as well as driving a tunnel and constructing bridge over the Kysuca Ri
  • On track for excellence in asphalt plants
    May 30, 2013
    While one leading asphalt plant company has played a key role in the creation of the new Circuit of the Americas F1 racetrack, others have been releasing new plants and plant-related technology onto the market, some of which has been exhibited at major world industry shows. Guy Woodford reports. Astec played an important role in the new Circuit of the Americas Formula 1 racetrack in Austin, Texas. The asphalt base, binder, and surface courses for the 5.47km asphalt road course, which staged its first F1 rac