Skip to main content

Agreement reached on construction machine data standards

A new standard is being reached for construction and quarry machine data.
By MJ Woof February 4, 2020 Read time: 3 mins
An agreement has been reached on standardisation of data produced by construction and quarrying machines

An agreement has been reached on standardisation for data being produced by construction and quarrying machines. This was achieved at a general meeting of the Working Group Machines in Construction MiC 4.0 in Berlin. The agreement now takes the ISO 15143-3 international standard into the next phase. And MiC 4.0 paves the way for a quality assurance system.

The member companies first agreed on a uniform understanding of data  and the focus is now on construction process data. The common goal of this cooperation between manufacturers and users is to deliver a quality assurance system to guarantee a uniform standard for the construction industry.

The focus of the current 80 members is to establish the standards developed by MiC 4.0 in the market and to have them checked by a neutral authority. This requires a test centre for interfaces, conformity audits and certificates as proof. In coming months, the working group will work out concepts, examine the economic efficiency and search for suitable partners.

This standard relates to earthmoving machines, cranes, special civil engineering, road construction, concrete technology, building material plants and attachments. The participating companies have already agreed on the individual parameters for a uniform understanding of machine condition data. The results for the process data are to be determined in the course of this year.

This will be followed by the work of the Data Rights Working Group. However, it is a hot topic, as nobody can make a legal claim to data sovereignty. There are no specific laws that regulate the ownership of general machine data. At the moment, there is only the possibility to make contractual agreements which, for example, categorise the data, assign it to the contracting parties by licensing or create factual ownership through encryption and other technical measures.

The System Architecture Working Group deals with the requirements for communications. Standards for the structures, processes and symbols for operating mobile machines are defined by the Human Machine Interface HMI working group. Manufacturers, machine users and system integrators are continuously working on a coordinated industrial standard. This will be followed by a standardisation process.

The research project Building 4.0, funded by the Federal Ministry of Education and Research, is a joint project of 20 industrial partners and two universities - the Institute for Mechatronic Mechanical Engineering at the TU Dresden is the overall leader. Both universities presented the current state of research. They are working on the topics of automation and networking of working machines, 5G machine and construction site networking and solutions for digital processes on the construction site. The vision is to develop a completely digitalized, automated and flexibly adaptable construction site, with possibilities to simulate and optimize construction machinery and construction processes, to involve the operators as coordinators to increase efficiency and productivity and thus create new business models and value chains. The project will run until 31st July 2022 and is costing €9 million, of which €4.8 million euros is funded.

MiC 4.0 is an international consortium in cooperation with the VDMA and HDB. Companies, universities and research institutions can become members. Website: mic40.org

Related Content

  • Funding road research in Kenya as infrastructure development grows
    August 14, 2017
    The demand for road construction material research and testing services in Kenya is expected to soar. The East African country is going through a construction boom, despite policy and financial challenges facing public institutions overseeing the research and testing operations in the transport industry. “Kenya is going through a construction boom and so is the demand for construction material testing services,” said Juma Ali Madzitsa, Geotechnical Lab Supervisor at SGS Kenya, a subsidiary of Swiss based in
  • bauma expo space almost sold out
    January 20, 2022
    bauma organisers say the mining, construction and quarrying event has sold 97% of exhibitor space more than 10 months before opening its doors.
  • Innovative traffic information technology used in Vancouver
    April 12, 2012
    As the world descended on Vancouver for the 2010 Winter Olympics, visitors were able to travel around the city with confidence and intelligence thanks to a landmark project by IRF Member, Delcan
  • ERF sets out sign inspection guidelines
    December 27, 2024
    The European Union Road Federation suggests that its checklist - downloadable for free - is included in any existing tools for road safety inspection and audits that road agencies may have.