Skip to main content

HCME's new parts depot

The new Hitachi Construction Machinery (Europe)/HCME European Parts Depot has been officially opened. At the Oosterhout facility, southern Netherlands, the guest of honour was Hitachi Construction Machinery president Michijiro Kikawa, who gave a speech to other guests at the ceremony, among them Mitsuhiro Tabei, president of HCME. He then presented representatives from the parts depot with a special Japanese maple tree, which was planted in front of the building. In his address, Mr Kikawa emphasised the imp
February 17, 2012 Read time: 2 mins
The new 233 Hitachi Construction Machinery (Europe)/1139 HCME European Parts Depot has been officially opened.

At the Oosterhout facility, southern Netherlands, the guest of honour was Hitachi Construction Machinery president Michijiro Kikawa, who gave a speech to other guests at the ceremony, among them Mitsuhiro Tabei, president of HCME. He then presented representatives from the parts depot with a special Japanese maple tree, which was planted in front of the building.

In his address, Mr Kikawa emphasised the importance of the new facility, saying: "It is a great honour to officially open this new parts depot, and to have the opportunity to join my colleagues from HCME at such an important event in our history.

"The aim of the company investing in this larger, improved facility is to provide the best possible service to our dealers and customers. Parts availability has further increased due to the new facility's greater capacity and efficiency. This will help Hitachi to boost parts sales and meet the demands of our expanding customer base." The 53,000m² depot, which cost €12million, has a covered stock area that is three times the size of the previous Parts Distribution Centre, which was also situated in Oosterhout. It has the capacity to stock up to 90,000 individual parts lines at any one time and will be responsible for distributing them throughout Europe, Middle East, Russia/CIS and Africa. In addition to a special chemical storage area, it includes a 14-metre high storage area for larger items.

Efficiency will be ensured by a dedicated Warehouse Management System, which will guide operatives in unpacking and storing received parts, as well as picking, packing and shipping ordered items. It will employ a total of 70 people, who will have the potential to handle up to 800 packages each day and 70,000 parts items every month.

For more information on companies in this article

Related Content

  • IRF Geneva takes centre stage at the 1st Africa Road Safety Forum
    January 15, 2019
    Africa has 2% of the world’s cars but 16% of the world’s road deaths, and more than 300,000 people lose their lives in road traffic crashes in the region every year, while thousands more are injured. Against this background the 1st Africa Road Safety Forum was organised in Marrakech, Morocco on 13-15 November. The event had the support of IRF (Geneva) and provided an opportunity to present the newly created IRF Global Road Data Warehouse and to mark the establishment of an IRF Africa. The event was placed
  • Liebherr opens a new logistics facility in Germany
    June 26, 2015
    The Liebherr Group now has a new logistics centre located at Oberopfingen, Germany. This facility is supplying customers around the world with spare parts for the firm’s wheeled and crawler excavators, wheeled loaders and bulldozers, as well as some other machines. The new facility has been opened followinga policy of centralisation of parts supply. Work started to construct the facility in mid-2013.
  • Kobelco expanding European headquarters
    December 11, 2023
    Kobelco is expanding its European headquarters
  • Hitachi helps to build a better Stockholm
    November 19, 2024
    The ZE135 electric excavator has been put to the test on a high-profile development in the Stockholm Green Innovation District. This new growth area for technology and sustainability is being developed with the goal of renewing and building urban spaces with climate-smart solutions.