Skip to main content

Astrak gets a grip on road travel for tracked equipment

A first-class paving job should have first class protection with Astrak’s premium rubber pads for steel-tracked equipment. The DuraLine Plus pads are made of abrasion resistant Malaysian rubber suitable for a wide range of machines, said Martyn Pointer, Astrak’s group sales director. Independent test results show that the pads offer more than 25% more durability compared to standard quality rubber pads.
May 15, 2018 Read time: 2 mins
Easy on the eyes and easy on the road: DuraLine Plus pads from Astrak
A first-class paving job should have first class protection with Astrak’s premium rubber pads for steel-tracked equipment.


The DuraLine Plus pads are made of abrasion resistant Malaysian rubber suitable for a wide range of machines, said Martyn Pointer, 8769 Astrak’s group sales director. Independent test results show that the pads offer more than 25% more durability compared to standard quality rubber pads.

The chunky one-pied vulcanised Roadliner version of the pad bolts directly onto the steel track train of machines in the 4-26 tonne range. The pad has an internal steel core specially treated during vulcanisation to ensure a secure bond between rubber and steel. An interlocking design reduces the build-up and clogging of material during operation. Widths range from 400-600mm.

Roadliner pads are secured via four fixed bolts onto the centre of the track chain. Meanwhile, the clip-on version allows a faster attaching process - up to half the time - as well as offering a longer life. The clip-on have a fixed bracket on one side and a secure clamp on the other. Widths range from 400-800mm.

Astrak’s bolt-on version is similar to the clip-on version. It’ four bolts are set wider apart than on the Roadliner version to allow it to fit onto the track shoe instead of the chain. They come in widths between 400-600mm.

For more information on companies in this article

Related Content

  • World of Asphalt/AGG1 Aggregates Forum & Expo
    April 13, 2012
    World of Asphalt 2012 and the co-located AGG1 Aggregates Forum & Expo will be the largest in the history of the two events.
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Advances in mobile crushing delivers cost savings
    February 29, 2012
    New and improved mobile crushing and screening equipment is focused on delivering cost/tonne reductions in aggregate production - Geoff Ashcroft reports. The level of technology being applied to mobile crushing and screening systems continues to advance, which is indicative of manufacturer confidence in this sector as one that continues to offer an economic benefit. An example of how electronic technology can lead to greater productivity can be found with KPI-JCI - the firm has introduced a high resolution