Skip to main content

Recycled pavement use rises again in the US, according to NAPA

The use of reclaimed asphalt pavement in the United States increased during 2013 after two years of no rise, according the latest report from the US National Asphalt Pavement Association (NAPA). The report found that more than 73 million tons of reclaimed asphalt pavement and 1.7 million tons of reclaimed asphalt roofing shingles were used in new asphalt pavement mixes in the United States during in 2013. Using recycled asphalt material saved about $2 billion in 2013 over the use of virgin materials,
January 16, 2015 Read time: 3 mins
The use of reclaimed asphalt pavement in the United States increased during 2013 after two years of no rise, according the latest report from the US 3464 National Asphalt Pavement Association (NAPA).

The report found that more than 73 million tons of reclaimed asphalt pavement and 1.7 million tons of reclaimed asphalt roofing shingles were used in new asphalt pavement mixes in the United States during in 2013.

Using recycled asphalt material saved about $2 billion in 2013 over the use of virgin materials, the report noted.

The use of recycled material is one of several topics to be discussed at a major Conference on road asset maintenance in Paris, the Pavement Preservation and Recycling Summit from, February 22-25.

The NAPA/FHWA report said that the number of tons of asphalt pavement mixtures produced using recycled and reclaimed materials was predominately flat from 2012 to 2013. This is despite a 2.5% drop in total tons of asphalt produced during 2013 compared to 2012.

However, the percentage of tons produced using these materials was slightly greater in 2013 than 2012.

The survey was conducted in mid-2014 by NAPA under contract to the 2410 Federal Highway Administration (FHWA). The report was compiled using results from 249 companies with 1,281 plants in all 50 US states, the District of Columbia and Puerto Rico. Also used was information from asphalt pavement associations in 38 states.

A full copy of the NAPA/FHWA report can be downloaded from %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal here Download the form false http://www.asphaltpavement.org/recycling false false%>.

The issue of saving money but at the same time maintaining road assets is one of the most important discussions globally, especially during these austere times where governments at all levels are seeing budget drastically reduced. But road must be maintained or the wider economy will suffer.

“Insufficient maintenance has created a backlog and is affecting service levels,” said Jean-Francois Corte, secretary general of the World Road Association (3141 PIARC), based in Paris.

“What’s needed right now is at least a medium-term vision to embrace the right type of maintenance, a strong strategy. Because there has been insufficient maintenance, road networks are degrading faster. Many highways authorities don’t have this medium- or long-term approach to highway maintenance because they are bound by their government’s annual budgets.”

Attendees to the Pavement Preservation and Recycling Summit in Paris next month will learn how, during these austere times, to put the business case forward to ensure more investment is there when and where it is needed.

Speakers will include Bud Wright, executive director of the 3510 American Association of State Highway and Transportation Officials (AASHTO) and William Finerty, a vice-president of 178 Caterpillar.

To find out more about the three-day PPRS 2015 event and register, please visit the official 7924 PPRS 2015 website.

A recent publication by PIARC, called The Importance of Road Maintenance, is available as a free download from %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal here Visit PIARC website false http://www.piarc.org/en/publications/technical-reports/ false false%>.

Related Content

  • First public outing for Liebherr tower crane at INTERMAT
    April 20, 2012
    Liebherr used INTERMAT 2012 to show its new 380 EC-B 16 Litronic flat-top crane. The 380tonne unit tops the 15-model range, which starts from 50tonnes. The new “flagship” can lift loads of up to 3,400kg at its 75m maximum radius. With the Litronic system, the 380 EC-B 16 can provide up to 20% more load lift at the push of a button. This is achieved by integrating the load-moment limiting system, the ABB operating-range limiting system and the MDA machine data evaluation program.
  • Cost rises again for Columbia’s unfinished La Linea tunnel
    February 3, 2015
    Columbia’s transport minister has said it will take nearly US$168 million and more than two years to finish the controversial La Linea tunnel. Natalia Abello Vives said the government has a “plan B” to finish the 8.65km tunnel, which, as World Highways reported in May, has less than a kilometre remaining to be constructed. It was originally scheduled to be open by last November. The La Linea tunnel project, or Segundo Centenario tunnel, crosses the central mountain range and forms part of the Bogota-B
  • Hitachi wants to be the number one European equipment supplier
    January 6, 2017
    Hitachi Construction Machinery Europe boss Moriaki Kadoya told INTERMAT 2015 that the manufacturer wants to be number one in Europe as it launched a new hybrid ZW220 wheeled loader and a stage IV compliant Zaxis 300LC excavator.
  • Hitachi wants to be the number one European equipment supplier
    April 22, 2015
    Hitachi Construction Machinery Europe boss Moriaki Kadoya told INTERMAT 2015 that the manufacturer wants to be number one in Europe as it launched a new hybrid ZW220 wheeled loader and a stage IV compliant Zaxis 300LC excavator.