Skip to main content

Tenerife seeks funding for proposed vehicle racing track

The government of Tenerife said it is looking for investors to come up with around $32 million (€25.7m) to construct and run the proposed Circuit de Tenerife racing track. The tender, to manage the 4.07km track for 40 years but which could be extended to 46, was opened in September and will close on February 3. Tenerife is the largest and most populous island of the seven Canary Islands, part of Spain but an autonomous region lying off the northwest African coast. The island, with around 2,030km2 has arou
November 7, 2014 Read time: 2 mins
The government of Tenerife said it is looking for investors to come up with around $32 million (€25.7m) to construct and run the proposed Circuit de Tenerife racing track.

The tender, to manage the 4.07km track for 40 years but which could be extended to 46, was opened in September and will close on February 3.

Tenerife is the largest and most populous island of the seven Canary Islands, part of Spain but an autonomous region lying off the northwest African coast. The island, with around 2,030km2 has around 900,00 inhabitants – more than 40% of the Canary Islands – and received around 6 million tourists last year, making it one of Europe’s most visited destinations.

Tenerife also offers companies operating on the island 4% business tax and other attractive benefits.

Eduardo Pintado, Commerce Councillor of Tenerife and president of the Automotive Federation of Tenerife, made the announcement in London, saying there is a “long tradition of motor sports” in Tenerife.

“The design for the proposed race track is modern and functional and its complies with national and international car and motorcycling federations in order to run competitions to the highest standards,” he said.

Track design has been done by GPO Test Facility Engineering, based in Barcelona. GPO specialises in planning, design and construction management of test circuits for all kinds of vehicles and drivetrains, from Formula One cars and agricultural tractors to heavy-duty engines. It has built tracks in Spain, Brazil, Argentina, Peru, Columbia, China, South Korea and the United States.

A 21-month construction time is “realistic”, Pintado told 3260 World Highways. “We think in 14 or 15 months from start on site, the most important parts of the circuit would be done including the asphalt.

For more information on companies in this article

Related Content

  • CECE Congress focuses on future of construction
    May 8, 2012
    The bi-annual CECE Congress was held in Spain when participants looked forward in a bid to see what will happen in the next ten years. Growth markets such as China, India and Brazil offer big opportunities to European construction equipment manufacturers. As companies, particularly those from China, start to expand outside their own countries the competition for business will increase, and it has been claimed that there is no such thing as 'the global market', rather it is the sum of hundreds, if not thousa
  • Researchers trial 3D printing for both concrete and asphalt roads
    March 20, 2019
    Nearly a decade on from when Singapore’s Formula 1 (F1) track was first laid, Shell Bitumen’s high-performance binder, Shell Cariphalte, has been selected once more for resurfacing works. The Federation Internationale de l’Automobile (FIA) sets stringent standards for the performance of its tracks, which are made even more challenging given Singapore’s climate. The road surface must remain constant, despite temperatures of up to 30oC and humidity levels above 70%. The 5km Marina Bay Street Circuit, wh
  • Kazakhstan announces infrastructure investment programme to 2020
    April 2, 2015
    Kazakhstan’s deputy minister for investments and development Zhenis Kasymbek has said that about US$20 billion will be invested in development of all types of transport infrastructure by 2020. The main funds will be allocated for the Caspian region, in particular for projects to improve connections to Azerbaijan, Georgia and Turkey. Apart from road infrastructure, money will be invested to construct the Beyneu-Zhezkazgan railway and development of the Altynkol-Khorgos railway section in the direction of
  • 2-4 year-old construction equipment tops buyer ‘wish list’
    May 11, 2012
    A leading used construction equipment auctioneer firm boss believes equipment aged between 2 and 4 years is now topping buyers’ ‘wish lists’, as 1 to 2-year-old used stocks deplete. Jonnie Keys, General Manager of Euro Auctions, said that with the cost of new equipment currently up by around 20% on prices in June 2009, the used market is still strong. “Euro Auctions has repeatedly seen over 30% of all plant sold leaving the UK and Europe for projects in Australia, South Africa, South America, Central Ameri