Skip to main content

Tenerife seeks funding for proposed vehicle racing track

The government of Tenerife said it is looking for investors to come up with around $32 million (€25.7m) to construct and run the proposed Circuit de Tenerife racing track. The tender, to manage the 4.07km track for 40 years but which could be extended to 46, was opened in September and will close on February 3. Tenerife is the largest and most populous island of the seven Canary Islands, part of Spain but an autonomous region lying off the northwest African coast. The island, with around 2,030km2 has arou
November 7, 2014 Read time: 2 mins
The government of Tenerife said it is looking for investors to come up with around $32 million (€25.7m) to construct and run the proposed Circuit de Tenerife racing track.

The tender, to manage the 4.07km track for 40 years but which could be extended to 46, was opened in September and will close on February 3.

Tenerife is the largest and most populous island of the seven Canary Islands, part of Spain but an autonomous region lying off the northwest African coast. The island, with around 2,030km2 has around 900,00 inhabitants – more than 40% of the Canary Islands – and received around 6 million tourists last year, making it one of Europe’s most visited destinations.

Tenerife also offers companies operating on the island 4% business tax and other attractive benefits.

Eduardo Pintado, Commerce Councillor of Tenerife and president of the Automotive Federation of Tenerife, made the announcement in London, saying there is a “long tradition of motor sports” in Tenerife.

“The design for the proposed race track is modern and functional and its complies with national and international car and motorcycling federations in order to run competitions to the highest standards,” he said.

Track design has been done by GPO Test Facility Engineering, based in Barcelona. GPO specialises in planning, design and construction management of test circuits for all kinds of vehicles and drivetrains, from Formula One cars and agricultural tractors to heavy-duty engines. It has built tracks in Spain, Brazil, Argentina, Peru, Columbia, China, South Korea and the United States.

A 21-month construction time is “realistic”, Pintado told 3260 World Highways. “We think in 14 or 15 months from start on site, the most important parts of the circuit would be done including the asphalt.

For more information on companies in this article

Related Content

  • Norway’s massive Rogfast Tunnel project
    December 11, 2018
    The world's longest and deepest road tunnel is underway in western Norway - Adrian Greeman reports
  • Russia’s most expensive road project to commence
    January 15, 2019
    Construction work is being planned for Russia’s most expensive road, which will be built in south of the country – Eugene Gerden reports Work is due to commence shortly on Russia’s most expensive road, in the south of the country. The highway will form part of the existing 1,600km Moscow-Sochi road, according to recent statements from senior officials at the Russian Ministry of Transport as well as local analysts. As part of the project, the Russian Government, together with private investors, plans to
  • Ecuador to receive proposals for El Oro and Guayas motorway
    July 29, 2015
    Ecuador's Transport and Public Works Ministry will receive proposals for a 95km motorway between El Oro and Guayas provinces this month. Seven firms are reportedly interested in building the motorway under a 30-year concession and work could start by the end of the year, according to a report in the Telegrafo newspaper. The motorway will have three toll booths that each will charge US$1.50. (EUR 1.37) each. The winner will operate the concession for 30 years. The road will have a length of 95kms. The c
  • Poland: A1 tender attracts 11 offers, including one from Strabag
    February 19, 2015
    Construction of a 15.2km section of Poland’s A1 motorway has attracted 11 bids. A Strabag consortium made the lowest bid for the section, between Pyrzowice and Rzasawa, coming in at €146 million. A consortium formed by Polaqua and Dragados was the second lowest, at €156.4 million. The highest bid was €183.4 million. The contract calls for a construction period of 30 months. Meanwhile, the province of Mazowsze, or Masovia, with its 5.5 million inhabitants and the capital Warsaw, will get nearly €2.1 billion