Skip to main content

Tenerife seeks funding for proposed vehicle racing track

The government of Tenerife said it is looking for investors to come up with around $32 million (€25.7m) to construct and run the proposed Circuit de Tenerife racing track. The tender, to manage the 4.07km track for 40 years but which could be extended to 46, was opened in September and will close on February 3. Tenerife is the largest and most populous island of the seven Canary Islands, part of Spain but an autonomous region lying off the northwest African coast. The island, with around 2,030km2 has arou
November 7, 2014 Read time: 2 mins
The government of Tenerife said it is looking for investors to come up with around $32 million (€25.7m) to construct and run the proposed Circuit de Tenerife racing track.

The tender, to manage the 4.07km track for 40 years but which could be extended to 46, was opened in September and will close on February 3.

Tenerife is the largest and most populous island of the seven Canary Islands, part of Spain but an autonomous region lying off the northwest African coast. The island, with around 2,030km2 has around 900,00 inhabitants – more than 40% of the Canary Islands – and received around 6 million tourists last year, making it one of Europe’s most visited destinations.

Tenerife also offers companies operating on the island 4% business tax and other attractive benefits.

Eduardo Pintado, Commerce Councillor of Tenerife and president of the Automotive Federation of Tenerife, made the announcement in London, saying there is a “long tradition of motor sports” in Tenerife.

“The design for the proposed race track is modern and functional and its complies with national and international car and motorcycling federations in order to run competitions to the highest standards,” he said.

Track design has been done by GPO Test Facility Engineering, based in Barcelona. GPO specialises in planning, design and construction management of test circuits for all kinds of vehicles and drivetrains, from Formula One cars and agricultural tractors to heavy-duty engines. It has built tracks in Spain, Brazil, Argentina, Peru, Columbia, China, South Korea and the United States.

A 21-month construction time is “realistic”, Pintado told 3260 World Highways. “We think in 14 or 15 months from start on site, the most important parts of the circuit would be done including the asphalt.

For more information on companies in this article

Related Content

  • Faroes: NCC careful of Sandoy Tunnel work around St Magnus Cathedral
    March 17, 2020
    NCC is careful to not disturb the 800-year old St Magnus Cathedral on Sandoy Island.
  • Improving road safety in Europe?
    July 24, 2012
    New plans by the European Commission are being proposed in a bid to reduce accident levels on the road. The changes are being made in a bid to reduce accident levels caused by defective vehicles. Under the new rules, all motorcycles and scooters would require technical inspections at regular intervals.
  • Chile approves construction of the Agua Negra project through the Andes
    August 13, 2015
    Plans for a cross-continent upgraded road were recently boosted when Chile’s senate approved construction of its share of a major US$1.6 billion tunnel in the Andes Mountains. The Chilean approval comes after the Argentinian government gave the nod in March for construction on its section of the Agua Negra project. A tender for specific design work could be put out by September, according to the Argentinian newspaper Diario de Cuyo. The approvals resolve a number of bilateral issues including taxation
  • Illinois puts out an RFI for Interstate 55 Managed Lanes Project
    August 16, 2016
    The US state of Illinois has issued a Request for Information to develop a plan with private investors for the US$425 million Interstate 55 Managed Lanes Project. The public-private partnership project could serve as a model for rebuilding state roads and bridges,” said Illinois transportation secretary Randy Blankenhorn. Responses from the RFI are due by September 8, ahead of one-on-one meetings with potential private partners on September 20-21. A written statement from the department of transpor