Skip to main content

Tenerife seeks funding for proposed vehicle racing track

The government of Tenerife said it is looking for investors to come up with around $32 million (€25.7m) to construct and run the proposed Circuit de Tenerife racing track. The tender, to manage the 4.07km track for 40 years but which could be extended to 46, was opened in September and will close on February 3. Tenerife is the largest and most populous island of the seven Canary Islands, part of Spain but an autonomous region lying off the northwest African coast. The island, with around 2,030km2 has arou
November 7, 2014 Read time: 2 mins
The government of Tenerife said it is looking for investors to come up with around $32 million (€25.7m) to construct and run the proposed Circuit de Tenerife racing track.

The tender, to manage the 4.07km track for 40 years but which could be extended to 46, was opened in September and will close on February 3.

Tenerife is the largest and most populous island of the seven Canary Islands, part of Spain but an autonomous region lying off the northwest African coast. The island, with around 2,030km2 has around 900,00 inhabitants – more than 40% of the Canary Islands – and received around 6 million tourists last year, making it one of Europe’s most visited destinations.

Tenerife also offers companies operating on the island 4% business tax and other attractive benefits.

Eduardo Pintado, Commerce Councillor of Tenerife and president of the Automotive Federation of Tenerife, made the announcement in London, saying there is a “long tradition of motor sports” in Tenerife.

“The design for the proposed race track is modern and functional and its complies with national and international car and motorcycling federations in order to run competitions to the highest standards,” he said.

Track design has been done by GPO Test Facility Engineering, based in Barcelona. GPO specialises in planning, design and construction management of test circuits for all kinds of vehicles and drivetrains, from Formula One cars and agricultural tractors to heavy-duty engines. It has built tracks in Spain, Brazil, Argentina, Peru, Columbia, China, South Korea and the United States.

A 21-month construction time is “realistic”, Pintado told 3260 World Highways. “We think in 14 or 15 months from start on site, the most important parts of the circuit would be done including the asphalt.

For more information on companies in this article

Related Content

  • ACE/AECOM report: private sector and user-pay for English roads
    May 14, 2018
    It’s one minute to midnight for funding England’s roads, according to a timely new report, and the clock’s big hand is pointing to some form of user-pay solution, reports David Arminas Is there any way out of future user-pay funding for England’s highway infrastructure? The answer is a resounding ‘no’, according to the recently published report: Funding Roads for the Future. The brief 25-page document by the London-based Association for Consultancy and Engineering, ACE**, sums up the state of England’s ro
  • NCC picks up Eysturoy and Sandoy tunnel contracts in the Faroes
    November 15, 2016
    Swedish construction company NCC has signed a contract to build two sub-sea road tunnels in the Faroe Islands, an archipelago north of Scotland. The first project – the Eysturoy Tunnel between Eysturoy and Streymoy - will cost around €152 million. The value of second one – the Sandoy Tunnel between Streymoy and Sandoy – will cost about €120 million, but there is an option for the government-owned client, P/F Eystur- och Sandoyartunlar (EST), not to proceed. The government created the company, Eystur – og
  • Improved airport for Thimarafushi atoll
    August 29, 2014
    Thimarafushi forms part of the Thaa Atoll lying in the Indian Ocean but access has been limited in the past. However the construction of a new airport planned by the Maldives Government will help develop the tourist trade, boosting the local economy. Most visitors previously used the country’s two international airports, using these as hubs for flights to the country’s six domestic airports. This has limited travel to only a few of the country’s 1,192 islands, of which around 200 are inhabited. As a result,
  • Engine/component efficiencies are top bill
    May 25, 2016
    Driveline specialist Dana is developing a full connectivity suite for its transmissions, axles and other driveline components. The Dana Spicer Smart Suite collects, manages, analyses, communicates and acts on data from the complete drivetrain, including load and condition monitoring, torque management, speed sensing and steering sensing. This provides critical alerts and allows the operator to react to operational changes, boosting productivity and safety. “As the construction market becomes more comp