Skip to main content

Argentina opts for Finnish engineering input

Finnish contractor Pöyry is starting work on a road inspection programme in Northern Argentina . The firm was awarded the €1 million contract to inspect works on provincial road #28 in Argentina by the Road Infrastructure National Programme. Pöyry is carrying out this Inter-American Development Bank financed project in partnership with local company IATASA and the technical services will be provided over a 36 month period.
May 29, 2012 Read time: 1 min
Finnish contractor 5775 Pöyry is starting work on a road inspection programme in Northern Argentina . The firm was awarded the €1 million contract to inspect works on provincial road #28 in Argentina by the Road Infrastructure National Programme. Pöyry is carrying out this 2791 Inter-American Development Bank financed project in partnership with local company IATASA and the technical services will be provided over a 36 month period. The scope of the works includes 70km of paving works of existing road, building a concrete viaduct and a concrete bridge and work to protect against erosion and repairing of existing hydraulic works. When the work is complete, the road will be able to carry traffic all year round despite prevailing weather conditions during seasonal changes.

For more information on companies in this article

Related Content

  • Bridge improvements reduce flood threat
    February 16, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).
  • Bridge improvements reduce flood threat
    April 4, 2012
    The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th