Skip to main content

Argentina opts for Finnish engineering input

Finnish contractor Pöyry is starting work on a road inspection programme in Northern Argentina . The firm was awarded the €1 million contract to inspect works on provincial road #28 in Argentina by the Road Infrastructure National Programme. Pöyry is carrying out this Inter-American Development Bank financed project in partnership with local company IATASA and the technical services will be provided over a 36 month period.
May 29, 2012 Read time: 1 min
Finnish contractor 5775 Pöyry is starting work on a road inspection programme in Northern Argentina . The firm was awarded the €1 million contract to inspect works on provincial road #28 in Argentina by the Road Infrastructure National Programme. Pöyry is carrying out this 2791 Inter-American Development Bank financed project in partnership with local company IATASA and the technical services will be provided over a 36 month period. The scope of the works includes 70km of paving works of existing road, building a concrete viaduct and a concrete bridge and work to protect against erosion and repairing of existing hydraulic works. When the work is complete, the road will be able to carry traffic all year round despite prevailing weather conditions during seasonal changes.

For more information on companies in this article

Related Content

  • Demand diversity in the construction equipment sector
    June 1, 2015
    Demand within the global construction equipment manufacturing industry is anything but homogenous, with certain countries and sales regions significantly outperforming others, with a whole host of factors fuelling and suppressing each key market - Guy Woodford reports
  • Ethiopia’s building roads
    November 29, 2013
    Ethiopia is set to benefit economically from investment in a number of new key road links totalling over US$1 billion. The east African nation’s 218km Modjo-Hassan highway is expected to cost US$720 million to construct. The highway will be constructed in two stages. The first section of the route will stretch 93km from Modjo to Zeway and is expected to cost $350 million to complete. The second section of the highway will be 125km long and link Zeway with Hewassa and this stretch is estimated to cost $370
  • New bridge refurbishment solutions now available
    July 15, 2015
    An array of new bridge refurbishment and repair solutions are available – Mike Woof writes Around the world there are many bridges requiring repairs or refurbishment, and there is a ready market for novel solutions to upgrade existing structures. New developments offer quicker and more efficient ways to improve bridge surfaces and structural performance and add new life to ageing designs. Spancrete is broadening the availability of its novel precast building solutions worldwide by offering these to th
  • SSL hits back over criticism of its work on the Champlain Bridge
    December 11, 2017
    The contactor building the replacement Champlain Bridge in Canada has hit back over of allegations of poor workmanship in the US$3.3 billion project. The new 3.4km cable-stayed Champlain Bridge over the St Lawrence River will have six lanes vehicle lanes and a separate cycle and pedestrian lane. Design life is 125 years and is being constructed under a public-private partnership and operating contract of 30 years after completion of construction. Work includes construction of a smaller bridge for Île des