Skip to main content

Wopfinger Transportbeton’s efficiency investment

Wopfinger Transportbeton’s investment in a new sand washing plant at their Eggendorf site in Lower Austria is said to have resulted in a 60% increase in gravel production - from 135tonnes/hour to 220 tonnes/hour. Before the new Evowash sand washing plant was installed, Wopfinger were working two shifts at Eggendorf to meet the capacity requirements of the ready mix concrete plant located at the sand and gravel pit. This has now been reduced to one shift as a result of both the quality and quantity of the wa
June 24, 2013 Read time: 2 mins
7393 Wopfinger Transportbeton’s investment in a new sand washing plant at their Eggendorf site in Lower Austria is said to have resulted in a 60% increase in gravel production - from 135tonnes/hour to 220 tonnes/hour.

Before the new Evowash sand washing plant was installed, Wopfinger were working two shifts at Eggendorf to meet the capacity requirements of the ready mix concrete plant located at the sand and gravel pit. This has now been reduced to one shift as a result of both the quality and quantity of the washed gravel now being produced.

“Our previous sand production system was a real bottleneck for us,” explained Franz Denk, technical director at Wopfinger Transportbeton. “By addressing this issue we have introduced significant efficiencies into our production processes at Eggendorf.”

The new Evowash 101 sand washing plant produces 100tonnes/hour of washed 0-4mm sand, exclusively used in onsite concrete production. The Evowash receives material from the existing wet screening plant directly to the sump where it is then pumped to the integrated 62.5cm cyclone. The underflow from the hydrocyclone is discharged onto the Evowash dewatering screen and stockpiled, while the waste water containing the 0-63 micron fraction overflows the top of the hydrocyclone and is sent to settling ponds.

Wopfinger Transportbeton has manufactured concrete at Eggendorf since 1990. The plant was upgraded in 2011 to support the construction of the A2 Motorway for which Wopfinger supplied more than 25,000m³ of concrete. The Eggendorf production facility is located just off the A2 approximately 50kms south of Vienna. It is one of four Lower Austria-based gravel plants operated by Wopfinger Transportbeton. This project by Wopfinger Transportbeton is said to be indicative of a renewed focus from the construction materials industry on the identification of areas for investment that will create efficiencies and reduce costs within existing processes.

For more information on companies in this article

Related Content

  • Austrian firm recycling materials with mobile machinery
    March 18, 2016
    An Austrian firm is recycling road materials using mobile machines supplied by Rockster. The R900 and RSS49 units are being used by Austrian specialist Neuberger to recycle materials from an array of construction and demolition sources. The products are then used in an array of applications including road base materials, earthworks and slope construction. The family-owned firm runs a large gravel pit in Ehrwald and uses its Rockster RSS49 scalping screen RSS49 for recycling construction waste and RAP. The f
  • Rebuilding a scenic route in South Africa
    April 20, 2018
    Equipment from Wirtgen has played a key role in the rehabilitation of a major route in Cape Town. The scenic Camps Bay Drive provides access to Camps Bay and Hout Bay Based on the project brief and geometric analysis, Camps Bay Drive required widening to cope with high volumes of tourist traffic and MyCiti buses. In order to minimise the impact on traffic, the design brief targeted construction outside the summer peak tourist season and also required investigation into shortened construction periods. The
  • Advanced asphalt plant innovations
    November 30, 2022
    Key advances are being seen in the asphalt plant market, with leading manufacturers developing new systems to produce materials more efficiently and with lower emissions, while using more recycled asphalt pavement (RAP) and also offering greater mobility
  • Naylor drains away waste water concerns
    January 26, 2017
    A bespoke waste water drainage system saved time and money on a recent UK motorway scheme Work on the London’s M25 motorway Junction 30/A13 Corridor Relieving Congestion Scheme is being undertaken by joint venture contractor Balfour Beatty/Skanska. The project is valued at nearly €91 million and completion is for autumn 2016. There has been a successful continual programme of clean-up using road-sweeper/gulley cleaning trucks to remove detritus from the works areas. Disposal of this type of waste w