Skip to main content

Volvo wins on aggregate

In the Canadian city of Coquitlam, 3,628tonnes of glacial clay is being excavated every day across a 90hectare aggregate open-pit mine. LaFarge in North America is the largest diversified supplier of construction materials in the United States and Canada. For the last decade the company has used Greater Vancouver-based contractor, Vertex Excavating, to work across its 90hectare aggregate open-pit mine, exposing and transporting some of the best concrete aggregate material available on the market. Th
December 3, 2013 Read time: 4 mins
In the Canadian city of Coquitlam, 3,628tonnes of glacial clay is being excavated every day across a 90hectare aggregate open-pit mine.

3180 Lafarge in North America is the largest diversified supplier of construction materials in the United States and Canada. For the last decade the company has used Greater Vancouver-based contractor, Vertex Excavating, to work across its 90hectare aggregate open-pit mine, exposing and transporting some of the best concrete aggregate material available on the market.

The mine is located in the heart of the Pacific Northwest rain forest, where the average annual rainfall exceeds 1.27m. In the winter months it’s even more challenging with more than 1.52m of snow falling on mountainous land. Sunshine is scarce, and mountain roads are steep, with many paths on an incline of 20 degrees or higher.

“We are dealing with a lot of steep hills,” said Mike Pratchett, president of Vertex. “We also have to deal with almost 3.2km haul cycles and rain for 10 months of the year, resulting in muddy slippery slopes. You could say we have tough working conditions to contend with almost all year round.”

Vertex not only excavates clay and till at the mine but also clears the mountainside of logs, strips off the over-burden (that in some areas can be over 30m deep), controls mine waste management and works with the provincial and local authorities on water management and environmental issues, as well as road building.

With this amount of responsibility, Vertex needs reliable and efficient machinery it can count on. Volvo Construction Equipment (359 Volvo CE) machines help to expose daily more than 3,600tonnes of the best concrete aggregate. Vertex has no equipment in its fleet without the Volvo name on it. Its current taskforce consists of a pair of Volvo EC360B excavators, five Volvo A25D articulated haulers and a Tier 4-compliant Volvo EC380D crawler excavator.

One of the first of its kind to be delivered in North America, the Volvo EC380D has set the standard with its powerful Volvo D13Tier 4i engine rated at 208kW, maximum digging reach of 11.7m, maximum digging depth of 8.1m, and a maximum operating weight of 39.39tonnes. This heavy-duty production machine can be used for quarrying, road building, truck loading, mining construction, mass excavation, utility trenching and more.

“When the machine arrived, we added a few additional accessories to it, such as the larger 60-inch digging bucket, a hydraulic thumb and, because our contract calls for log clearing, we added the falling object protective structure (FOPS) to guard the cab from falling debris,” said Patchett. “It’s a tremendous machine, plenty of power, great stability, superior lighting and a cab full of creature comforts. Even in this till and clay that has been compacted for centuries, the excavator has allowed us to improve our cycle times.”

The Vertex team is pleased with the performance of its Volvo A25D articulated haulers. “My dad started his business using Volvo machines, and I’ve been around them all my working life,” commented Patchett. “When it came time to buy my own trucks, I wouldn’t consider any other brand. Because of the efficiency of the transmission retarders and exhaust brakes, we haven’t had to replace a single brake pad.”

“We do everything that our customer asks of us,” he added. “If we don’t have the equipment or the manpower, we’ll go and get it. A satisfied customer is a happy customer, and we have a terrific working relationship with Volvo CE’s dealer in the region – Great West Equipment. We do the daily maintenance, but when it comes to larger issues, we just give them a call and they’re here.”

For more information on companies in this article

Related Content

  • Futureproofing UK construction equipment resilience
    May 5, 2021
    Rob Oliver is the longstanding CEO of the Construction Equipment Association (CEA), the UK trade association for the UK construction equipment industry. Guy Woodford recently caught up with him to discuss the industry’s health and the key issues facing the CEA and its members in 2021 and beyond.
  • Volvo EC210D chosen for volcano protection work in the Philippines
    February 15, 2019
    Four EC210D units from Volvo Construction Equipment are delivering much needed protection to Filipino villagers living near the Mayon volcano. The heavy-duty machines are building spillways to direct lava, debris and rain away from populated areas, while simultaneously preserving valuable aggregate resources. The Mayon volcano near the city of Legazpi is one of the most active volcanoes in the Philippines. While volcano soil is extremely fertile for farming, lava flows are always a hazard. In addition,
  • Sales gain for Italian manufacturers
    February 22, 2016
    An upswing is being seen in construction machine sales in Italy, according to the latest official figures. The data from the Samoter-Prometeia Observatory reveal increases in key markets. Gains have been seen in Europe (+7.7%), Central and Eastern Europe and Turkey (+3.7%), North America (+23.1%), Central and South America (+6.3%), Middle East (+26.3%), Asia (+28.7%), Australia (+23.5%) and Africa (+2.5%). However the figures also show another sharp fall in Russia (-62.8%).
  • UK universities' research shows potholes can be fixed better
    February 14, 2013
    Academic research by two UK universities shows that patch repairs on potholes could be far more durable if a few simple techniques were consistently used. An initial study - undertaken by Nottingham Trent University and the University of Nottingham in central England– found that the application of a coat of bitumen emulsion between two layers of asphalt in a clean, dry repair, greatly improved its resistance to further cracks. It was also confirmed that a hot mix repair – in which asphalt is heated to 140°C