Skip to main content

Volvo wins on aggregate

In the Canadian city of Coquitlam, 3,628tonnes of glacial clay is being excavated every day across a 90hectare aggregate open-pit mine. LaFarge in North America is the largest diversified supplier of construction materials in the United States and Canada. For the last decade the company has used Greater Vancouver-based contractor, Vertex Excavating, to work across its 90hectare aggregate open-pit mine, exposing and transporting some of the best concrete aggregate material available on the market. Th
December 3, 2013 Read time: 4 mins
In the Canadian city of Coquitlam, 3,628tonnes of glacial clay is being excavated every day across a 90hectare aggregate open-pit mine.

3180 Lafarge in North America is the largest diversified supplier of construction materials in the United States and Canada. For the last decade the company has used Greater Vancouver-based contractor, Vertex Excavating, to work across its 90hectare aggregate open-pit mine, exposing and transporting some of the best concrete aggregate material available on the market.

The mine is located in the heart of the Pacific Northwest rain forest, where the average annual rainfall exceeds 1.27m. In the winter months it’s even more challenging with more than 1.52m of snow falling on mountainous land. Sunshine is scarce, and mountain roads are steep, with many paths on an incline of 20 degrees or higher.

“We are dealing with a lot of steep hills,” said Mike Pratchett, president of Vertex. “We also have to deal with almost 3.2km haul cycles and rain for 10 months of the year, resulting in muddy slippery slopes. You could say we have tough working conditions to contend with almost all year round.”

Vertex not only excavates clay and till at the mine but also clears the mountainside of logs, strips off the over-burden (that in some areas can be over 30m deep), controls mine waste management and works with the provincial and local authorities on water management and environmental issues, as well as road building.

With this amount of responsibility, Vertex needs reliable and efficient machinery it can count on. Volvo Construction Equipment (359 Volvo CE) machines help to expose daily more than 3,600tonnes of the best concrete aggregate. Vertex has no equipment in its fleet without the Volvo name on it. Its current taskforce consists of a pair of Volvo EC360B excavators, five Volvo A25D articulated haulers and a Tier 4-compliant Volvo EC380D crawler excavator.

One of the first of its kind to be delivered in North America, the Volvo EC380D has set the standard with its powerful Volvo D13Tier 4i engine rated at 208kW, maximum digging reach of 11.7m, maximum digging depth of 8.1m, and a maximum operating weight of 39.39tonnes. This heavy-duty production machine can be used for quarrying, road building, truck loading, mining construction, mass excavation, utility trenching and more.

“When the machine arrived, we added a few additional accessories to it, such as the larger 60-inch digging bucket, a hydraulic thumb and, because our contract calls for log clearing, we added the falling object protective structure (FOPS) to guard the cab from falling debris,” said Patchett. “It’s a tremendous machine, plenty of power, great stability, superior lighting and a cab full of creature comforts. Even in this till and clay that has been compacted for centuries, the excavator has allowed us to improve our cycle times.”

The Vertex team is pleased with the performance of its Volvo A25D articulated haulers. “My dad started his business using Volvo machines, and I’ve been around them all my working life,” commented Patchett. “When it came time to buy my own trucks, I wouldn’t consider any other brand. Because of the efficiency of the transmission retarders and exhaust brakes, we haven’t had to replace a single brake pad.”

“We do everything that our customer asks of us,” he added. “If we don’t have the equipment or the manpower, we’ll go and get it. A satisfied customer is a happy customer, and we have a terrific working relationship with Volvo CE’s dealer in the region – Great West Equipment. We do the daily maintenance, but when it comes to larger issues, we just give them a call and they’re here.”

For more information on companies in this article

Related Content

  • A Strong Customer Support Network: Vital to intelligent Machine Control Success
    April 2, 2024
    With the support of the Komatsu distributor TSEs, Komatsu customers are reassured to get all the benefits from the Komatsu intelligent machine control features.
  • Transylvania Motorway: route to prosperity
    July 4, 2012
    Work is progressing apace on the biggest infrastructure project in Europe, the Transylvania Motorway or Autostrada Transilvania (A3) in Romania, with completion scheduled for 2013. The four-lane, 415km motorway, stretching northwest from Brasov in central Romania, at an altitude of nearly 600m, will reach the country's northwestern border with Hungary at Oradea in Câmpia Crisanei at 130m above sea level, and will connect the cities of Brasov, Fagaras, Sighisoara, Târgu Mures, Cluj-Napoca, Zalau and Oradea.
  • Higher production from all-wheel-drive haulers
    August 2, 2012
    The improvements to articulated dump trucks (ADTs) have been substantial in recent years. Comparing a present day machine with one from 20 or even just 10 years ago shows how far design has come. Major improvements have been made in visibility, operator comfort levels, rough terrain performance, driveline efficiency and productivity, to name but a few key areas. All of the latest generation ADTs available on the world market now come with Tier 3/Stage IIIA compliant diesels that produce far lower noise and
  • Ibiza quarry relies on Cat
    July 30, 2012
    Forty years ago the father of Juan Cardona, the current owner of the quarry Cantera Can Orvay on the island of Ibiza, Spain, started extracting limestone. Today, with 20 employees and a daily output of 3,000tonnes, the company, Áridos y Prefabricados, has grown to become the biggest family owned quarry in the island. "When my father asked if I'd like to study or work, I said I'd like to work. And so I've been working here for 27 years. Since my father's retirement, I've been in charge of the quarry," Juan C