Skip to main content

Turkish asphalt plant supplied to Denmark

April 19, 2022 Read time: 2 mins
Turkish firm E-MAK has supplied asphalt plant technology to a customer in Denmark

A customer in Denmark is now benefiting from asphalt production technology supplied by Turkish firm E-MAK.

The company, Dansk Støbeastfalt, is based in Ringstead, Denmark and is a subsidiary of the DAB Group, which is headquartered in Gothenburg and is itself part of DAB Holding.

DAB has other asphalt plants located in Kungälv, Sweden and Roskilde, Denmark, both of which focus on producing mastic asphalt and other specialty materials. DAB also owns Spesialdekker, a firm that produces special coatings and is based in Norway.

The new E-MAK plant was supplied through its German subsidiary, which is based in Cologne and opened in 2021 to support sales and aftersales services in Europe. The plant itself was manufactured in Turkey and was delivered in up to 40 trailers shipped from E-MAK’s factory in Bursa. Commissioning of the plant was completed in December 2021 and in the first week of January 2022, the facility was first used to produce asphalt.

The plant has been designed to offer a production capacity of 200tonnes/hour. It can be used to supply an array of asphalt types. These include all types of hot mix asphalt (HMA), guus (mastic) asphalt and it can also be used for cold recycling applications. The plant is equipped with three 60m³ cylindrical bitumen tanks for PMBs, as well as eight 20m³ silos for virgin aggregates. In addition it has three cookers for guus (Mastic) asphalt.

The asphalt skip has a capacity of 3tonnes while the plant has three asphalt bunkers under the mixer, two of which have capacities of 25tonnes while the third has a capacity of 10tonnes. There are two lateral bunkers, each with capacities of 60tonnes, although more of theses could be added if required.

The plant features additive dosing technology capable of adding wax, granular or liquid types. It also has a cold reycling system featuring two expansion ducts, which is said to enable a high percentage of cold recycling.

For more information on companies in this article

Related Content

  • Lintec showcases redesigned CSD 1500 plant at bauma
    January 6, 2017
    Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.
  • E-Mak is supplying asphalt plants to Europe
    April 25, 2024

    Turkish firm E-MAK is now supplying its asphalt plants to customers in Europe. The first plant is already commissioned in Bilbao in Spain with a second being delivered shortly to a customer in the UK.

    The machine going to the UK is being supplied to a Derby-based firm that has previously concentrated on the concrete precasting and readymix market but is now widening its operations to include supplying asphalt. The firm is buying one of the E-MAK Express batching plants, which will offer a rated capacity of 160tonnes/hour.

  • Major producer of road construction materials
    February 10, 2012
    The Simge Group operates a massive and highly modern quarrying operation close to the Turkish city of Bursan, which provides a major supply of aggregates and asphalt to the country's highway construction sector. This quarry produces around 4 million tonnes/year of crushed limestone and is the largest of the five quarries the Simge Group runs in Turkey, which have a combined output of 12 million tonnes/year. The huge site has an asphalt output of 500,000tonnes/year, again a significant portion of the 1.2 mil
  • Producing recycled materials at an airport for surface use
    October 1, 2018
    Recycling of materials has been carried out at Cologne/Bonn Airport in a move to boost efficiency Using the Wirtgen KMA 220 mobile cold recycling mixing plant allows road construction materials to be recycled or upgraded onsite and avoids the need for numerous transport trips. The system is also economical, as became clear from a job at Cologne/Bonn airport at the end of 2017. There the plant, located immediately next to the job site, produced around 11,000tonnes of materials for a hydraulically bound ba