Skip to main content

Trommel fine clampdown boosts Max X demand

A recent HMRC clampdown on UK trommel fines is said to have led to sky-high demand for Dig A Crusher’s Max X Tract Density Separator. Despite being part of the Dig A Crusher product line for the past few years, last year saw only 11 models delivered to customers. Although their use was pioneered by forward-thinking recycling companies keen to extract every ounce of value from their waste streams, the vast majority of firms were content with paying the £2.50 Landfill Tax imposed on the trommel waste fines th
November 30, 2012 Read time: 2 mins

A recent HMRC clampdown on UK trommel fines is said to have led to sky-high demand for Dig A Crusher’s Max X Tract Density Separator.

Despite being part of the 6950 Dig A Crusher product line for the past few years, last year saw only 11 models delivered to customers. Although their use was pioneered by forward-thinking recycling companies keen to extract every ounce of value from their waste streams, the vast majority of firms were content with paying the £2.50 Landfill Tax imposed on the trommel waste fines the machine is designed to process.

However, within 24 hours of the launch of the HMRC fine clampdown on Friday, May 18, Dig A Crusher managing director Sean Heron received three confirmed orders for the Density Separators, marking the start of the machine’s popularity.

“On 18 May, HM Revenue & Customs issued a brief that said that waste fines that had previously been covered by the lower £2.50/tonne Landfill Tax rate would be charged at the full £64/tonne rate with immediate effect.   This left waste management, demolition and recycling companies staring down the barrel of a huge hike in their waste disposal costs,” Heron says.   “Overnight, we went from offering a very good, low-volume, niche machine to having the low-cost solution to a 2,500% disposal rate increase.”

The Max X Tract Density Separator is designed to segregate stone, lights, wood ferrous and non ferrous materials from -100mm materials, enhancing materials resource efficiency and minimising the levels of material sent to landfill.  Weighing just nine tonnes and fully self-contained, the compact yet durable machine is said to be easily incorporated into existing waste handling and extraction streams, allowing users to extract potentially valuable recyclable materials to generate additional revenue and minimise waste disposal by up to 90%. It is capable of processing up to 150tonnes/hour.

For more information on companies in this article

Related Content

  • English quarry opts for MDS trommels
    March 22, 2016
    Gallagher Aggregates’ Hermitage Quarry, near Maidstone in south-east England, has purchased two MDS trommels from recently appointed distributor Blue Machinery London. The 155tonne M820, is one of the world’s largest tracked mobile trommels. It is joined on site by the smaller 50tonne M515. Both models are fully mobile on crawler undercarriage and feature hydraulic folding stockpiling conveyors for quick set-up once in position. The M515 is producing fines (-120mm), which fall through the initial holes i
  • Southeast Asia’s cutting-edge asphalt production
    April 1, 2014
    An eye-catching state-of-the-art asphalt plant is making a big impact in South East Asia, while other new and proven asphalt plant technology remains in demand in Europe and other continents. Guy Woodford reports Marini China has ventured out of its traditional Chinese market to deliver to a Singaporean customer what is claimed to be Asia’s largest asphalt plant. An impressive 45m tall and capable of producing 360tonnes/hour, the plant model was in response to Ley Choon Group’s request for a new plant ahead
  • Kieswerk Kohler solves fines problem with M2500 from CDE
    September 26, 2013
    Following installation of the M2500 mobile washing plant, Kieswerk Kohler is said to have addressed the issues caused by excess fines in the material at their quarry in Engen / Welschingen, southern Germany. The solution offered by CDE has also enabled the production of an additional sand product which the company is now able to offer customers. The raw material processed by Kieswerk Kohler at the site contains a large proportion of material smaller than 250 microns. With the crushing and screening proce
  • On track for excellence in asphalt plants
    May 30, 2013
    While one leading asphalt plant company has played a key role in the creation of the new Circuit of the Americas F1 racetrack, others have been releasing new plants and plant-related technology onto the market, some of which has been exhibited at major world industry shows. Guy Woodford reports. Astec played an important role in the new Circuit of the Americas Formula 1 racetrack in Austin, Texas. The asphalt base, binder, and surface courses for the 5.47km asphalt road course, which staged its first F1 rac