Skip to main content

Thermal Road Repairs heats up the pavement surfacing market

UK-based company Thermal Road Repairs says it has developed a paver-mounted system that enhances pavement surfacing. The unit eliminates joints in asphalt repair so extends the life of the pavement, resulting in significant cost savings and less disruption to the road network, according to Thermal Road,
November 28, 2016 Read time: 2 mins
Thermal Road Repairs says it has developed a paver-mounted system

UK-based company 8543 Thermal Road Repairs says it has developed a paver-mounted system that enhances pavement surfacing.

The unit eliminates joints in asphalt repair so extends the life of the pavement, resulting in significant cost savings and less disruption to the road network, according to Thermal Road.

Asphalt lasts for around 20 years before effective deterioration but joints begin to fail after about seven years.

With TRR’s paver-mounted thermal technology, carriageways and other surfaces are seamless from the start of the asphalt laying process so require much less maintenance.

“Our paver-mounted heater allows our clients to replicate echelon paving,” said Aidan Conway, managing director at Thermal Road Repairs.

“They can pave seamlessly, using virgin material or by hot-matching new material with existing asphalt, without inhibiting output from the paving crew. There are other thermal asphalt repair systems in the market but with our technology, clients can operate far more efficiently and cost effectively and deliver a more resilient and superior surface finish, adding significantly to road lifespan.”

A heater, weighing 70kg and measuring 2000mm x 320mm, is mounted onto the side of the paver and controlled heat is pulsed into the joints. Material is heated in front of the screed and the treatment area is compacted across the joint.

“There are hundreds of miles of roads across the country where joints have failed, and continue to do so because the underlying joint is not completely eradicated.

This is a huge inconvenience to drivers and councils who are struggling to maintain good quality surfaces on their limited budgets. Enhanced with our thermal technology, pavers can now permanently eliminate joints so road surfaces can stay better for longer.” 

Pat McKay, plant general manager with 2340 Lagan Plant in the UK, was upbeat about the unit’s finishing work. “We installed the paver heaters on our Vogele machines for our [London] City Airport contract in July. The team are very happy with the kit and the performance of the heaters. This has improved the quality of the finish for our client”.

For more information on companies in this article

Related Content

  • Road recycling in Denmark
    May 13, 2024
    A novel approach to road refurbishment has saved time, money and carbon emissions in Denmark, while delivering a quality road surface.
  • How waste plastic and soybean oil are helping our roads last longer
    April 13, 2018
    A new super-modifier is born from waste plastic in Italy and a soybean-based rejuvenator from the US spreads from its home market. By Kristina Smith The two bitumen technologies featured this month come from almost opposing sources. One emerges from the human-created plastic waste plaguing our planet, the other from a plant. However, both technologies have been created with the same aims: to increase the life of roads, saving cost and ultimately reducing the impact of road building on the planet. A coll
  • Managing resource to create more resilient roads
    June 22, 2018
    As pressure increases on the cost and availability of resources, investment in recycling technology continues to grow across the road building industry. To meet its full potential, a greater understanding is needed of material performance to allow the building of more resilient, sustainable and economic networks - *David Smith explains.
  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.