Skip to main content

Thermal Road Repairs heats up the pavement surfacing market

UK-based company Thermal Road Repairs says it has developed a paver-mounted system that enhances pavement surfacing. The unit eliminates joints in asphalt repair so extends the life of the pavement, resulting in significant cost savings and less disruption to the road network, according to Thermal Road,
November 28, 2016 Read time: 2 mins
Thermal Road Repairs says it has developed a paver-mounted system

UK-based company 8543 Thermal Road Repairs says it has developed a paver-mounted system that enhances pavement surfacing.

The unit eliminates joints in asphalt repair so extends the life of the pavement, resulting in significant cost savings and less disruption to the road network, according to Thermal Road.

Asphalt lasts for around 20 years before effective deterioration but joints begin to fail after about seven years.

With TRR’s paver-mounted thermal technology, carriageways and other surfaces are seamless from the start of the asphalt laying process so require much less maintenance.

“Our paver-mounted heater allows our clients to replicate echelon paving,” said Aidan Conway, managing director at Thermal Road Repairs.

“They can pave seamlessly, using virgin material or by hot-matching new material with existing asphalt, without inhibiting output from the paving crew. There are other thermal asphalt repair systems in the market but with our technology, clients can operate far more efficiently and cost effectively and deliver a more resilient and superior surface finish, adding significantly to road lifespan.”

A heater, weighing 70kg and measuring 2000mm x 320mm, is mounted onto the side of the paver and controlled heat is pulsed into the joints. Material is heated in front of the screed and the treatment area is compacted across the joint.

“There are hundreds of miles of roads across the country where joints have failed, and continue to do so because the underlying joint is not completely eradicated.

This is a huge inconvenience to drivers and councils who are struggling to maintain good quality surfaces on their limited budgets. Enhanced with our thermal technology, pavers can now permanently eliminate joints so road surfaces can stay better for longer.” 

Pat McKay, plant general manager with 2340 Lagan Plant in the UK, was upbeat about the unit’s finishing work. “We installed the paver heaters on our Vogele machines for our [London] City Airport contract in July. The team are very happy with the kit and the performance of the heaters. This has improved the quality of the finish for our client”.

For more information on companies in this article

Related Content

  • Bitumen technology ideal for road repairs
    July 4, 2012
    Mike Woof discusses some novel developments relating to bitumen In the developed countries of Western Europe there is an increasing shift away from new highway construction to maintaining and rebuilding existing roads. In Germany alone, a network of asphalt roads extending more than 600,000km will have to be maintained or repaired. Highway maintenance techniques do vary between European countries but some commonalities exist. There are techniques that have been sidelined in the last few years but which now
  • Vögele sets paving record in German capital
    September 16, 2015
    Material transfer vehicles and remixing systems are crucial to delivering quality paving. Using material transfer vehicles (MTVs) can play a major role in delivering high quality road surfaces. These units can help boost quality by minimising the risk of material or thermal segregation. A major road paving project has been carried out in Germany using innovative paving methods. For the first time ever, binder and surface courses were paved over a width of 15.5m. This paving job was carried out on a 4.2km st
  • Hot-to-hot paving upgrades Bremen City Airport runway
    September 30, 2013
    A new high quality runway surface has been laid at Bremen City Airport. This has provided a much-needed replacement at the airport as the old runway was laid over 20 years ago and was suffering from cracking and potholes. Laying the new surface required the airport to be closed, with the work having to be carried out in a tight time schedule. Contractor Heitkamp Erd- und Straßenbau was brought in to carry out the work as the firm had experience in runway rehabilitation projects having carried out pavemen
  • Dual layer, hot to hot paving at German airport
    August 18, 2015
    An airport in Germany has seen the use of very innovative asphalt paving techniques, with the use of dual-layer, hot-to-hot working. The method was used to meet a very tight schedule for the runway rebuilding work, while also delivering the high quality required. Two InLine Pave trains from Vögele were used at Rostock-Laage Airport to lay a new surface and binder course. The operation was innovative as the process used both hot-to-hot, echelon paving as well as dual layer, hot-on-hot working. Using this