Skip to main content

Superior is testing new machines at its own facility

A facility at Glenwood in the US is serving as a proving ground for new machines from Superior Industries. Situated right outside of Glenwood, MN, 57.6km away from Hancock Concrete’s headquarters, the Glenwood Pit is the source of rock product for the company’s concrete production.
December 15, 2017 Read time: 2 mins
Superior Industries is testing its own latest machines at its own Glenwood Pit facility
A facility at Glenwood in the US is serving as a proving ground for new machines from 2979 Superior Industries. Situated right outside of Glenwood, MN, 57.6km away from Hancock Concrete’s headquarters, the Glenwood Pit is the source of rock product for the company’s concrete production.


Hancock Concrete designs and fabricates precast concrete box culverts, round and arch pipe, manhole structures, and bridges. In 2011, the company was acquired by nearby Superior Industries.

In 2015 Superior decided to install newer and more efficient equipment at the Glenwood Pit as its original fleet was growing increasingly old and inefficient.

In addition to expanding the product line, Superior had also added construction management services to its offering. Led by a newly assembled team of industry veterans, the construction management crew would have an opportunity to implement systems and practice installation procedures. The Glenwood Pit project would give Superior the experience of being its own customer.

Planning for the project began in earnest in October 2015. In all, US$2 million worth of Superior equipment was installed at the Glenwood Pit. New products included the Patriot Cone Plant, Guardian Screen Plant, and Twin Screw Aggredry Wash Plant in addition to numerous conveyors for material transfer. The Guardian Screen Plant was an important addition. Previously, the pit was operating without a pre-screen. By screening out a portion of the material and transferring it to a waste pile, the plant operators were able to wash less sand, saving money and reducing wear and tear.

Starting this spring, the Glenwood Pit will have its first full season of operation. Looking ahead, Superior says that the pit will continue to serve as a proving ground for new products, a training site for Superior employees, and a showpiece for customers.

For more information on companies in this article

Related Content

  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.
  • Concrete paving carried out in Nigeria
    April 12, 2018
    A contractor in Nigeria has used concrete paving equipment from Wirtgen to construct a road surface in the south-west of the country AG-Dangote Construction Company used an SP 500 model to repave the road connecting Itori with Ibese, In Nigeria’s Ogun State. For this project, the contractor, a joint venture between the Brazilian company Andrade Gutierrez Company and Nigeria’s Dangote Group, relied on the Wirtgen slipform paver in inset application.
  • Fast-track Biloxi Bay bridge
    July 18, 2012
    Construction of a bridge destroyed in a hurricane was completed early, and with some added aesthetic benefits Hurricane Katrina, one of the deadliest and costliest natural disasters in US history, made landfall on 29 August, 2005, devastating the Gulf Coast. The US 90 Bridge over Biloxi Bay (connecting the communities of Biloxi and Ocean Springs, Mississippi) was one of many major highway and railroad bridges knocked out of service due to extensive storm damage. The eye of the storm passed 96km west of Bilo
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci