Skip to main content

Separators boost waste re-use

A London-based construction material recycling centre says its decision to use a pair of Max X Tract Density Separators is helping them cash in on perceived waste. The 777 Recycling Centre is using the separators supplied by Cheshire-based Dig A Crusher at its state-of-the-art site just outside Croydon. Forming the final stage of 777 Recycling Centre’s resource extraction process, the Waste Systems Ltd-built Max X Tract machines are recovering metals from biomass material while also removing plastics and pa
June 13, 2012 Read time: 2 mins
A London-based construction material recycling centre says its decision to use a pair of Max X Tract Density Separators is helping them cash in on perceived waste.

The 777 Recycling Centre is using the separators supplied by Cheshire-based Dig A Crusher at its state-of-the-art site just outside Croydon.

Forming the final stage of 777 Recycling Centre’s resource extraction process, the Waste Systems Ltd-built Max X Tract machines are recovering metals from biomass material while also removing plastics and paper from the same source.

More than 4,000tonnes of construction, demolition and skip waste arrives on site every week and is converted into a wide variety of products including fuel, ferrous and non-ferrous metals and plastics for onward processing, and a range of crushed concrete and aggregate products for reintroduction to the UK construction industry.

Weighing just nine tonnes, the Max X Tract uses a one-pass system to process up to 150tonnes/hour, depending upon feed material.

At the 777 Recycling Centre, the first Max X Tract unit receives material from a trommel via an elevated conveyor. It segregates the light and the heavy materials: the light being destined for RDF applications; with the heavier materials moving on for further processing to the other Max X Tract. Here the final clean-up occurs where wood gets separated from the aggregate, ensuring two high quality end products. The initial exposure of material to a Max X Tract effectively removes any remaining metals from the waste stream.

Related Content

  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Cold recycling with foamed bitumen – an innovative technique
    November 7, 2017
    The pressure to conserve materials in road construction means that resource-saving technologies are more in demand than ever before. Wirtgen’s cold recycling process is already proven and has the potential to meet future demand. Roads subjected to continuous and heavy traffic often show signs of damage that extend down to the road base. To eliminate this damage, the entire road needs structural rehabilitation. Full reuse of the milled material as well as its cost-effective treatment make cold recycling with
  • Grand achievement for Intermountain
    July 18, 2012
    A versatile solution has helped with a tricky project at the Grand Canyon in the US – Pierre Peltier When Intermountain Slurry Seal, a division of Granite Construction, submitted its bid in 2009 to repair roads and parking lots along the Grand Canyon’s North Rim, the company knew the job would come with challenges. The remote roads leading from Jacob’s Lake, Arizona, to the North Rim Lodge had deteriorated to a point that the Federal Highway Association’s (FHWA) Central Federal Lands (CFL) Highway Division