Skip to main content

Separators boost waste re-use

A London-based construction material recycling centre says its decision to use a pair of Max X Tract Density Separators is helping them cash in on perceived waste. The 777 Recycling Centre is using the separators supplied by Cheshire-based Dig A Crusher at its state-of-the-art site just outside Croydon. Forming the final stage of 777 Recycling Centre’s resource extraction process, the Waste Systems Ltd-built Max X Tract machines are recovering metals from biomass material while also removing plastics and pa
June 13, 2012 Read time: 2 mins
A London-based construction material recycling centre says its decision to use a pair of Max X Tract Density Separators is helping them cash in on perceived waste.

The 777 Recycling Centre is using the separators supplied by Cheshire-based Dig A Crusher at its state-of-the-art site just outside Croydon.

Forming the final stage of 777 Recycling Centre’s resource extraction process, the Waste Systems Ltd-built Max X Tract machines are recovering metals from biomass material while also removing plastics and paper from the same source.

More than 4,000tonnes of construction, demolition and skip waste arrives on site every week and is converted into a wide variety of products including fuel, ferrous and non-ferrous metals and plastics for onward processing, and a range of crushed concrete and aggregate products for reintroduction to the UK construction industry.

Weighing just nine tonnes, the Max X Tract uses a one-pass system to process up to 150tonnes/hour, depending upon feed material.

At the 777 Recycling Centre, the first Max X Tract unit receives material from a trommel via an elevated conveyor. It segregates the light and the heavy materials: the light being destined for RDF applications; with the heavier materials moving on for further processing to the other Max X Tract. Here the final clean-up occurs where wood gets separated from the aggregate, ensuring two high quality end products. The initial exposure of material to a Max X Tract effectively removes any remaining metals from the waste stream.

Related Content

  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor
  • Controlled demolition development
    January 25, 2017
    The development of reliable hydraulic attachments has brought a revolution in demolition technology. The hydraulic breaker, pioneered by the Krupp and Montabert brands, has firmly taken hold with a huge range of manufacturers now offering machines. Hydraulic attachment specialists such as Atlas Copco, Indeco and Sandvik (with its Rammer brand) now offer a range of tools that can deliver high efficiency and safety in demolition work. Meanwhile, developments with smaller tools offer productive methods for rep
  • Modern aggregate crushing and screening
    July 9, 2012
    Turning aggregates production into a truly industrial process and providing customers with accurately fine-tuned aggregates mixes is the secret behind the success of Vezzola, a family-owned company with operations in Italy's Lake Garda region. Vezzola's fully-equipped stationary plant in Montichiari, probably the country's most modern facility of this type, can produce up to 500 different aggregates recipes. The plant is another successful delivery by Metso's Mining and Construction Technology. Processing s
  • Circuit of the Americas Formula for F1 success
    April 4, 2013
    In November 2012, the new Circuit of the Americas (COTA) in Austin, Texas, hosted the first ever Formula 1 US Grand Prix on a purpose-built track. But, as Jeff Winke and Guy Woodford report, the construction of COTA was just as demanding as competing in an F1 race itself For COTA construction contractor Austin Bridge & Road, L.P., nothing was more vital to the successful building of the 5.5km F1 track than meeting the strict criteria for its asphalt-paved surface. “The amount of stress this pavement will un