Skip to main content

Sandvik’s telescopic chute to cut dust

Sandvik says that its novel WE6000i telescopic chute can help cut dust emissions and improve working efficiency on quarry sites. The unit can be used with a wide variety of equipment and has been developed from the proven WE series. The new units can be fed by conveyors with a belt width of less than 800mm and helps minimise dust emissions, as well as benefiting the working environment and surrounding areas.
March 14, 2017 Read time: 2 mins
The new telescopic chute unit from Sandvik is said to reduce dust emissions on quarry sites
RSS325 Sandvik says that its novel WE6000i telescopic chute can help cut dust emissions and improve working efficiency on quarry sites. The unit can be used with a wide variety of equipment and has been developed from the proven WE series. The new units can be fed by conveyors with a belt width of less than 800mm and helps minimise dust emissions, as well as benefiting the working environment and surrounding areas.

Fewer dust emissions means lower clean-up costs, and reduced need for maintenance, service and repair work all over the plant. A telescopic chute can also reduce stockpile segregation and improve product quality. A key feature is that a vacuum is generated inside by the material flow, reducing the requirement for expensive, service-demanding filtration systems. The chute is simple and rugged in design and is said to offer a good ratio between minimum and maximum length. The number of conical chute segments varies depending on the height of the stockpile and the feed conveyor. The unit can be operated from a control panel or manually via remote control and can be used with a wide variety of materials. The chute also senses its height above the material stockpile and automatically adjusts.

For more information on companies in this article

Related Content

  • Bilbao benefits from major tunnel project
    February 10, 2012
    The northern Spanish city of Bilbao looks set to benefit from a major tunnel construction project aimed at reducing traffic congestion on its vehicle clogged streets. The city is building a new underground metro section, Line 3, which will help carry commuters to and from the city's commercial centre and help reduce vehicle journey times on the surface. This project is also making use of the latest piece of tunnelling equipment from Sandvik, the MT520 roadheader, a powerful machine designed and built at
  • New wheeled loaders are coming to market
    August 10, 2021
    Several improved wheeled loader models are now being offered by major manufacturers
  • Improved excavators from major firms
    January 31, 2022
    New excavators are being offered that offer improved performance over previous generation machines
  • Asphalt paving trial for mat quality using MTVs
    December 8, 2015
    An asphalt paving trial at Rome Airport tested mat quality with and without the use of MTVs Rome’s airport Fiumicino or the Leonardo da Vinci Airport of Rome is one of Europe’s busiest airports and lies 25.6km southwest of the city, a 30-minute train ride away.