Skip to main content

Sandvik's QE440 makes its debut

Sandvik Mining and Construction's latest development in mobile scalping, the QE440, has been developed to cater for the serious aggregate producer, says the company.
April 4, 2012 Read time: 2 mins
Sandvik Mining and Construction's latest development in mobile scalping, the QE440
325 Sandvik Mining and Construction's latest development in mobile scalping, the QE440, has been developed to cater for the serious aggregate producer, says the company.

The machine, receiving its global launch at Hillhead 2010, boasts 40% more screening area than its predecessor, the QE340, and its stockpiling conveyors are both wider and higher to deal with the increased production capacity and facilitate larger stockpiles.

Punched plate, heavy duty mesh, rock fingers or grizzly bars can be fitted to the top deck while heavy duty mesh or fingers can be fitted to the bottom to match specific application and material requirements.

The QE440, fully tracked for on site mobility, comes complete with a more powerful, yet economical engine to power the machine whose applications include the screening of heavy overburden at a quarry face; pre-screening and scalping; recycling of construction and landfill waste, and separation of cohesive aggregates.

"The QE440 has a total scalping area of 5.5m x 1.75m/5m x 1.75m) and is capable of being fed by large crushers, yet precise enough to produce accurate aggregates, and tough enough to recycle mixed materials," says Sandvik.

With a heavy-duty crusher-type chassis, the machine can operate in the most hostile environments; has massive stockpiling capability through integrated hydraulic conveyors, and is easily transported from site to site.

For more information on companies in this article

Related Content

  • Russian quarry increases efficiency with Sandvik equipment
    August 20, 2015
    A quarry facility in Russia has increased working efficiency by using Sandvik machinery. Located in in the Kurgan Region (Urals) of Russia, the Sinarsky Quarry is benefiting from an increase in throughput and reduced downtime since its new Sandvik crushing and screening plant became fully operational. The company invested over €2 million on the new plant, and is aiming to use it in order to double its aggregates production. This increase in production is required in order to meet the doubling of demand for
  • Sophisticated screening
    February 15, 2012
    Designed for recycling applications, the Sandvik QA331 is a three-way split screener developed from the successful QA330. The machine offers greater screening capacity than its predecessor but retains the durable construction and suits applications in recycling and contracting.
  • Versatile crushing and screening equipment
    February 13, 2012
    Work on a key link in the United Arab Emirates is benefiting from the use of equipment supplied by Sandvik Mining and Construction. The firm supplied key equipment for the Salalah bypass project, a 32km road link that will span the entire length of Salalah City as it runs from Raysut in the east, towards Ayn Razat in the west.
  • Sandvik plant increases productivity
    December 3, 2012
    Lafarge Aggregates Malaysia’s Kulai quarry is designed to the highest standards of safety, productivity and efficiency With an emphasis on high standards of safe, efficient and productive operations, Lafarge Aggregates Malaysia recently installed new quarry plant. It became operational earlier this year after Sandvik Mining and Construction Malaysia designed and installed a 250tonnes/hour, four-stage crushing and screening plant in Kulai, Johor, some 270km south of the capital Kuala Lumpur. It is now fully