Skip to main content

Sandvik CH800i cone crushers include My Sandvik portal operation

Sandvik’s new series of premium series CH800i connected cone crushers includes a range of performance upgrades, some via the My Sandvik portal. This enables managers and operators to make fact-based decisions to improve areas that can reduce the risk of downtime for equipment. Other Sandvik automation features continuously measure and compensate for crusher liner wear, while Hydroset and the electric dump valve automatically provide overload protection to let tramp iron and other uncrushable material pass
November 7, 2018 Read time: 2 mins
325 Sandvik’s new series of premium series CH800i connected cone crushers includes a range of performance upgrades, some via the My Sandvik portal.


This enables managers and operators to make fact-based decisions to improve areas that can reduce the risk of downtime for equipment.

Other Sandvik automation features continuously measure and compensate for crusher liner wear, while Hydroset and the electric dump valve automatically provide overload protection to let tramp iron and other uncrushable material pass through.

Meanwhile, ASRi automatically adapts crushers to variations in feed conditions, explains Mats Dahlberg, Sandvik’s vice president for life cycle service within the company’s Mining and Rock Technology division.

Other upgrades for the CH800i series include a 65% stronger main shaft, and top and bottom shells that are up to 50% stronger than previous models, offering more reliability and higher availability.

The CH800i has bolted rather than welded top and bottom shell liners to reduce maintenance time and add greater safety. Since no welding is needed when changing liners, the process is up to 90% faster.

The new CH800i crusher system can be purchased as a completely new crusher, or clients can choose a Sandvik Reborn solution, replacing an existing crusher for a new one and reuses existing auxiliaries and infrastructure. This plug and play installation minimises disruption while maximising productivity - up to 40% cost savings compared to a complete crusher system, according to the company.

For more information on companies in this article

Related Content

  • Keestrack’s growing presence in China
    November 21, 2018
    Keestrack is introducing a comprehensive range of large tracked mobile machines to the Chinese market. These encompass all relevant screening and crushing technologies for quarrying, recycling and aggregates industry sectors. Four important new models are being unveiled. The B4 jaw crusher ensures less wear and better crushing capacities due to its double-deck vibrating pre-screen (2300 x 1000mm). The proven 1100 x 700mm jaw crusher (maximum feed size 600mm) reaches an hourly output up to 400tonnes and pro
  • Helsinki's tunnel project
    April 11, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • Helsinki's tunnel project
    May 9, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof. A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • Sandvik’s DT1131i jumbo and iSURE software in Iceland and Norway
    August 14, 2019
    Sandvik’s DT1131i three-boom, electro-hydraulic jumbo, iSURE tunnel management software and the latest drill bit hardware were recently put to the test in Iceland and Norway* Czech contractor Metrostav recently achieved 105m of tunnel excavation in a record-breaking six days. But it will be consistent performance and progress that will see Iceland’s Dyrafjordurgong Tunnel in the remote Westfjords region open on time and on budget. The 5.3km Dyrafjordurgong Tunnel is costing around €69 million and due