Skip to main content

Reducing plant noise

German quarrying firm Oetelshofen Kalk has cut noise emissions by half and tripled machine service life, by installing dual hardness rubber liners in its crushing plant. Based in Wuppertal, the Oetelshofen quarry company produces 2 million tonnes of limestone products/year, and has a turnover of €35 million/year.
February 7, 2012 Read time: 2 mins
Extra wear life is expected due to the installation of Sandvik's rubber wear plates at this intake hopper
German quarrying firm 2350 Oetelshofen Kalk has cut noise emissions by half and tripled machine service life, by installing dual hardness rubber liners in its crushing plant. Based in Wuppertal, the Oetelshofen quarry company produces 2 million tonnes of limestone products/year, and has a turnover of €35 million/year. Investment in equipment such as the new liners and the latest firing technology has been high with the firm keen to maximise output and operating efficiency, as well as reducing environmental impact.

The company used the WT7000 dual hardness rubber wear plates from 325 Sandvik for lining the 6m² feed hopper of a kiln. This modular system reduced noise emissions by 50% and six months later the company decided to equip its new 120m² hopper with the same type of rubber linings. A major challenge however was to choose the right material for the hopper, which is designed for a capacity of 500,000tonnes/year of limestone. The hopper requires a heavy duty lining as it is loaded by a 60tonne capacity truck, with a product size of up to 140mm.

The solution was to install 1,500 pieces of 50mm thick rubber liners mounted with welding studs. This has proved to be a particularly attractive solution as when the sharp edged stone wears out each plate these 300x300mm units can be replaced quickly. This patented modular system has protected the base of the hopper against cracks and deformation, retaining its original shape. In addition the liner lip protects against fines ingress between the gaps, while the service life is tripled.

A further benefit is environmental as the quarry is also home to a protected bird species, the European Eagle Owl. It has the largest population of these birds in Europe and due to the reduced noise from the plant, this will further aid breeding. Due to the success of the installation and the performance improvements, Oetelshofen is now considering using Sandvik wear protection at the limestone quarry for all its future plans. Discussion are already ongoing at the site involving product and material testing, with new applications such as lining truck boxes or using ceramic/rubber wear protection liners.

For more information on companies in this article

Related Content

  • Advances in tyre technology boost performance
    February 7, 2017
    New tyre technology will increase productivity and cut downtime - Mike Woof writes Key advances in tyre technology will offer extended life for customers, as well as substantial gains in productivity and durability. Meanwhile, some major developments are also being seen in the market, with a number of smaller players now accounting for a substantial portion of sales. Important developments for tyre users include new strategies intended to improve tyre life and cut costs for consumers. One of the majo
  • Intelligent road studs aim to make roads safer
    May 3, 2012
    High-tech road markings are being used in a bid make roads safer in Europe as Patrick Smith reports Intelligent road studs are being installed on two of the busiest sections of the main roads heading towards the port of Dover in County Kent, south-east England.
  • New array of earthmoving machines
    August 7, 2020
    Several firms are introducing new earthmoving machines with increased performance
  • Bolivia tunnel and highway project under construction
    February 9, 2017
    In Bolivia work is progressing on the strategic Incahuasi tunnel project – Mauro Nogarin writes In southern Bolivia, the Bolivian Highway Administrator (ABC) is supervising the construction of the Incahuasi Tunnel and Monteagudo-Muyupampa-Ipati road. This work is of fundamental importance for the country as it will improve the flow of traffic and boost trade between the departments of Santa Cruz and Chuquisaca. The Monteagudo-Ipati highway project includes the Incachuasi tunnel which has a length of 96km