Skip to main content

Rapid International supplies Collier Group with a batching plant

Rapid International has supplied Collier Group, based in Fife, Scotland, with the contractor’s first bespoke static concrete batching plant. Rapid, based in County Armagh, Northern Ireland, said that the batching plant was installed at Collier’s Goathill Quarry in Fife. Collier Group’s plant is built on a slope and includes five 4m-wide 80tonne capacity aggregate bins as well as three 160tonne capacity silos. The silos are accessed from the upper ground level, along with filler hoses to fill the four 2500
December 7, 2017 Read time: 2 mins
Rapid International’s plant for Collier Group is built on the side of a hill
316 Rapid International has supplied Collier Group, based in Fife, Scotland, with the contractor’s first bespoke static concrete batching plant.


Rapid, based in County Armagh, Northern Ireland, said that the batching plant was installed at Collier’s Goathill Quarry in Fife.

Collier Group’s plant is built on a slope and includes five 4m-wide 80tonne capacity aggregate bins as well as three 160tonne capacity silos. The silos are accessed from the upper ground level, along with filler hoses to fill the four 2500litre admixture tanks located in the mixer building.

The aggregates fall onto a 23m-long horizontal weigh-belt which feeds directly into the Rapid planetary mixer, producing outputs of 80m³ of concrete per hour. This is the only conveyor belt used in the entire plant as the bins can be filled directly by loading shovel, dump truck or tipper.

The batch control cabin with computer controls from Pneutrol, truck mixer loading point and wet hopper are all located on the lower yard level of the plant. This is where the blocks and precast are manufactured, inside or outside depending on weather conditions. This makes vehicle management and material supply easier to control.

Rapid provide bespoke concrete batching plants for a variety of applications, including concrete, precast concrete products, soil or aggregate recycling, bulk material handling, glass production, RCC, CTB, mine backfill, paving quality concrete, coldmix – foamed bitumen emulsion and bentonite landfill sealing.

Rapid said that its design team uses 3D modelling software to develop a bespoke plant to suit the customer’s site, budget and application.

Rapid also recently supplied London concrete contractor MixIt with its fifth Rapid pan concrete mixer, the R3000. It was installed at the contractor’s ready-mix production plant at MixIt’s headquarters in Bow, London. MixIt bought its first Rapid unit 22 years ago for its batching plant at Bow and which is still producing more than 20m³ ready-mix per hour.

Rapid has delivered and commissioned bespoke concrete batching plants and continuous concrete mixing plants around the world including Russia, Belgium and West Africa.

For more information on companies in this article

Related Content

  • Lintec presents new Gussasphalt plant for the European Market
    January 6, 2017
    German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw
  • Lintec presents new Gussasphalt plant for the European Market
    April 12, 2012
    German company Lintec will present for the first time its specially designed and fully containerised Gussasphalt plant for the European Market, the CDD 1200 GA. The plant has a capacity of 20tonnes of Gussasphalt per hour (optional up to 20tonnes/hour), and was sold to the French company SMAC (belonging to the Colas Group) and will operate in the west of France near Rennes. The plant has a hot bin with one chamber and can take 15tonnes of material while the recuperated filler silo is 11tonnes and one or tw
  • Durability is crucial while warm mix technology can help disaster recovery
    February 21, 2013
    Why durability is crucial for both emerging and developed economies, and how warm mix technology can help disaster recovery - Kristina Smith reports. When CORE Construction, a 100% owned Ghanaian company, started working on road construction projects five years ago, it was difficult to source the right bituminous mixes. “In the past, most construction firms had a number of challenges when it came to bituminous works, since the local capacity was not well-developed,” said CORE CEO Frank Lartey. CORE’s soluti
  • Glass ceiling breakthrough for Ammann in Australia
    November 18, 2019
    An Ammann ABP High Recycling Technology (HRT) asphalt mixing plant is a key part of an Australian recycled glass-for-asphalt scheme.