Skip to main content

Powerscreen machine aids in Australia’s key highway upgrade project

The major Pacific Highway upgrade in New South Wales is one of the largest road infrastructure projects undertaken in Australia. Connecting Sydney and Brisbane, the Pacific Highway is being upgraded to provide a four-lane divided road from Hexham to Queensland. The work commenced in 1996 and is scheduled for completion in 2020, with approximately 75%, a staggering 493km, of the work having already been completed.
April 16, 2018 Read time: 2 mins
The major Pacific Highway upgrade in New South Wales is one of the largest road infrastructure projects undertaken in Australia. Connecting Sydney and Brisbane, the Pacific Highway is being upgraded to provide a four-lane divided road from Hexham to Queensland.  The work commenced in 1996 and is scheduled for completion in 2020, with approximately 75%, a staggering 493km, of the work having already been completed.


The importance of selecting correctly-sized and shaped rock products in the construction of roads has a major impact on the longevity of the road’s surface.

Recently Lewis Quarry took delivery of a new Powerscreen Warrior 2400 mobile screen to produce three end products all supplied to the Pacific Highway upgrade. This large-scale scalper screen is fitted with a metal apron feeder section to accept heavy-duty feed materials and a highly aggressive triple shaft screenbox with a top deck screen media of 100mm punch-plate and a bottom deck of 40mm mesh. The screenbox is configured at 45° with two weights fitted which gives a steady flow of the feed material across the deck. For the project the -40mm is used for sub road-base while the mid-size material, -100mm to +40mm, is used for drainage rock. Finally, the oversized material, +100 to -300mm, is used for small end gabion rock.

Related Content

  • Accuracy from Sandvik’s WX6500 screening media
    April 13, 2018
    NCC Industry in Södra Sandby, Sweden has been using Sandvik’s latest screening media technology, the WX6500, for over a year The company reports that the first fine screening test panels are still in place and performing reliably. NCC Industry's Stone Materials division said that it has long chosen rubber screening media over wire mesh. The choice is crucial in Södra Sandby, where abrasive quartzite produces excessive wear on metal components. Yet despite its preference, the company said that it had stru
  • Sandvik's QE440 makes its debut
    April 4, 2012
    Sandvik Mining and Construction's latest development in mobile scalping, the QE440, has been developed to cater for the serious aggregate producer, says the company.
  • Sandvik's QE440 makes its debut
    February 6, 2012
    Sandvik Mining and Construction's latest development in mobile scalping, the QE440, has been developed to cater for the serious aggregate producer, says the company.
  • Aggregates production innovations delivering efficiency
    August 1, 2017
    EvoQuip, the newest division of Terex Corporation, is launching a Cobra 230 impact crusher later this year, to sit alongside the Cobra 260. The 24tonne machine will offer a production capacity of 140-150tonnes/hour in asphalt and construction recycling. The Cobra 230 is 11.3m long and 2.46m wide, or 5.15m wide with a side conveyor. It features a quick set-up time and the machine can be moved onsite without having to stop the crusher. Keestrack says that its novel H4 tracked cone crusher is light and compact