Skip to main content

Powerscreen machine aids in Australia’s key highway upgrade project

The major Pacific Highway upgrade in New South Wales is one of the largest road infrastructure projects undertaken in Australia. Connecting Sydney and Brisbane, the Pacific Highway is being upgraded to provide a four-lane divided road from Hexham to Queensland. The work commenced in 1996 and is scheduled for completion in 2020, with approximately 75%, a staggering 493km, of the work having already been completed.
April 16, 2018 Read time: 2 mins
The major Pacific Highway upgrade in New South Wales is one of the largest road infrastructure projects undertaken in Australia. Connecting Sydney and Brisbane, the Pacific Highway is being upgraded to provide a four-lane divided road from Hexham to Queensland.  The work commenced in 1996 and is scheduled for completion in 2020, with approximately 75%, a staggering 493km, of the work having already been completed.


The importance of selecting correctly-sized and shaped rock products in the construction of roads has a major impact on the longevity of the road’s surface.

Recently Lewis Quarry took delivery of a new Powerscreen Warrior 2400 mobile screen to produce three end products all supplied to the Pacific Highway upgrade. This large-scale scalper screen is fitted with a metal apron feeder section to accept heavy-duty feed materials and a highly aggressive triple shaft screenbox with a top deck screen media of 100mm punch-plate and a bottom deck of 40mm mesh. The screenbox is configured at 45° with two weights fitted which gives a steady flow of the feed material across the deck. For the project the -40mm is used for sub road-base while the mid-size material, -100mm to +40mm, is used for drainage rock. Finally, the oversized material, +100 to -300mm, is used for small end gabion rock.

Related Content

  • Rebuilding a scenic route in South Africa
    April 20, 2018
    Equipment from Wirtgen has played a key role in the rehabilitation of a major route in Cape Town. The scenic Camps Bay Drive provides access to Camps Bay and Hout Bay Based on the project brief and geometric analysis, Camps Bay Drive required widening to cope with high volumes of tourist traffic and MyCiti buses. In order to minimise the impact on traffic, the design brief targeted construction outside the summer peak tourist season and also required investigation into shortened construction periods. The
  • Sandvik’s Chinese renewal with new distribution
    November 21, 2018
    Sandvik Mobile Crushers & Screens now has a strong presence in China through its new mainland China distributor, Pota Environment (Shanghai). The firm’s novel QI441 Prisec impactor is said to offer unparalleled control, flexibility and productivity as a primary or secondary crusher for recycling and quarrying customers. The machine benefits from the patented Prisec crushing chamber, which has been designed by Sandvik to enable the base crusher to be easily switched between primary and secondary mode. This
  • Sandvik supporting aggregate production in Panama
    February 20, 2014
    Located 40km north of Panama City, Panama Development of Infrastructure (PDI) is assisting the Petaquilla Gold Mine, part of Petaquilla Minerals, in producing high quality aggregates from excavated materials at the mine. In order to support the activities of Petaquilla Minerals, the only mining company currently operating in Panama, PDI is using a selection of Sandvik drilling, crushing and screening equipment, all manufactured by, which has been supplied, and is supported by, Sandvik’s distributor in Pana
  • Bolivia tunnel and highway project under construction
    February 9, 2017
    In Bolivia work is progressing on the strategic Incahuasi tunnel project – Mauro Nogarin writes In southern Bolivia, the Bolivian Highway Administrator (ABC) is supervising the construction of the Incahuasi Tunnel and Monteagudo-Muyupampa-Ipati road. This work is of fundamental importance for the country as it will improve the flow of traffic and boost trade between the departments of Santa Cruz and Chuquisaca. The Monteagudo-Ipati highway project includes the Incachuasi tunnel which has a length of 96km