Skip to main content

Powerscreen machine aids in Australia’s key highway upgrade project

The major Pacific Highway upgrade in New South Wales is one of the largest road infrastructure projects undertaken in Australia. Connecting Sydney and Brisbane, the Pacific Highway is being upgraded to provide a four-lane divided road from Hexham to Queensland. The work commenced in 1996 and is scheduled for completion in 2020, with approximately 75%, a staggering 493km, of the work having already been completed.
April 16, 2018 Read time: 2 mins
The major Pacific Highway upgrade in New South Wales is one of the largest road infrastructure projects undertaken in Australia. Connecting Sydney and Brisbane, the Pacific Highway is being upgraded to provide a four-lane divided road from Hexham to Queensland.  The work commenced in 1996 and is scheduled for completion in 2020, with approximately 75%, a staggering 493km, of the work having already been completed.


The importance of selecting correctly-sized and shaped rock products in the construction of roads has a major impact on the longevity of the road’s surface.

Recently Lewis Quarry took delivery of a new Powerscreen Warrior 2400 mobile screen to produce three end products all supplied to the Pacific Highway upgrade. This large-scale scalper screen is fitted with a metal apron feeder section to accept heavy-duty feed materials and a highly aggressive triple shaft screenbox with a top deck screen media of 100mm punch-plate and a bottom deck of 40mm mesh. The screenbox is configured at 45° with two weights fitted which gives a steady flow of the feed material across the deck. For the project the -40mm is used for sub road-base while the mid-size material, -100mm to +40mm, is used for drainage rock. Finally, the oversized material, +100 to -300mm, is used for small end gabion rock.

Related Content

  • Australia’s new airport in Queensland
    August 18, 2015
    The first new airport constructed in Australia for 45 years is now open for business. The Brisbane West Wellcamp Airport in Queensland is located 17km to the west of Toowomba. The facility was completed at the end of last year by Wagners, an Australian family-owned construction company. Toowoomba lies in the Darling Downs region of Queensland, located 126km west of Queensland’s capital city, Brisbane. Toowoomba’s population of approximately 165,000 makes it Australia’s second-most populous inland city. T
  • Powerscreen crushing it at bauma!  
    October 25, 2022
    The high-performance Premiertrak 330 jaw crusher and Chieftain 1700X three-deck incline screen are standout models for Powerscreen.
  • EvoQuip to showcase crushers and screeners at North American open event
    June 11, 2019
    EvoQuip is holding an open event in North America that will showcase live working demos of its crushing and screening equipment. The manufacturer is co-hosting the event with distributor Emerald Equipment in Bridgewater, New Jersey on July 25-26. Equipment on show will include the Bison 280, Cobra 230 and 230R as well as the entire Colt range. Sean Donaghy, EvoQuip USA sales manager, commented: “EvoQuip are delighted to be working with Emerald Equipment on returning to the USA for a second open even