Skip to main content

Power Pavers catches the train

An SF-3000 machine from Power Pavers has been carrying out a paving job on Highway 218 to the north of Waterloo in the US state of Iowa. The SF-3000 machine forms part of a paving train on the project, which involved replacing and widening a section of the roadway and building new on/off ramps. The two-lane roadway has been paved to a thickness of 356mm and was paved over dowel baskets, while a key-way inserter with tie-bars was used. The job has also required the use of a Power Pavers PS-2700 placer/spread
November 29, 2012 Read time: 1 min
Paving equipment from Power Pavers has been used on a concrete road project in Iowa
An SF-3000 machine from 3975 Power Pavers has been carrying out a paving job on Highway 218 to the north of Waterloo in the US state of Iowa. The SF-3000 machine forms part of a paving train on the project, which involved replacing and widening a section of the roadway and building new on/off ramps. The two-lane roadway has been paved to a thickness of 356mm and was paved over dowel baskets, while a key-way inserter with tie-bars was used. The job has also required the use of a Power Pavers PS-2700 placer/spreader and a TC-2700 texture cure machine. Local firm Cunningham Construction, based in Cedar Falls, has been carrying out the concrete contracting portion of the work on the new road surface.

For more information on companies in this article

Related Content

  • Expanding the Panamericana Oestae Highway in Panama
    November 3, 2023
    Expansion of the Panamericana Oeste highway is an infrastructure project that will help guarantee the future of Panama - Mauro Nogarin writes
  • Concrete paving precision achieved
    August 15, 2019
    A Wirtgen SP 62i slipformer has been used for the cost-effective paving of concrete slab in the US state of Texas. The machine has been utilised for construction work in College Station, a town some 150km northwest of Houston, Texas.
  • Smart road surfacing in a tunnel
    August 19, 2022
    Smart road construction techniques have been used in the widest tunnel in Switzerland. Efficient operation and logistics were required for paving a width of 11.5m in the Gubrist Tunnel and contractor Marti AG Solothurn Bauunternehmung made good use of Vögele’s WITOS Paving Plus technology to optimise its work on the project.
  • Rising to the challenge
    July 18, 2012
    Visualise today's concept of a major commercial traffic corridor in the western United States. A roadway responsible for delivering goods to Arizona, Nevada and Utah, that also connects Mexico to the United States to Canada through the North American Free Trade Agreement (NAFTA). What springs to mind? A multi-lane highway carrying thousands of vehicles a day past cities at speeds up to 113km/hour, while egress ramps make sure vehicles get safely to city streets and their final destination. This is not the c