Skip to main content

Power Pavers catches the train

An SF-3000 machine from Power Pavers has been carrying out a paving job on Highway 218 to the north of Waterloo in the US state of Iowa. The SF-3000 machine forms part of a paving train on the project, which involved replacing and widening a section of the roadway and building new on/off ramps. The two-lane roadway has been paved to a thickness of 356mm and was paved over dowel baskets, while a key-way inserter with tie-bars was used. The job has also required the use of a Power Pavers PS-2700 placer/spread
November 29, 2012 Read time: 1 min
Paving equipment from Power Pavers has been used on a concrete road project in Iowa
An SF-3000 machine from 3975 Power Pavers has been carrying out a paving job on Highway 218 to the north of Waterloo in the US state of Iowa. The SF-3000 machine forms part of a paving train on the project, which involved replacing and widening a section of the roadway and building new on/off ramps. The two-lane roadway has been paved to a thickness of 356mm and was paved over dowel baskets, while a key-way inserter with tie-bars was used. The job has also required the use of a Power Pavers PS-2700 placer/spreader and a TC-2700 texture cure machine. Local firm Cunningham Construction, based in Cedar Falls, has been carrying out the concrete contracting portion of the work on the new road surface.

For more information on companies in this article

Related Content

  • Meeting the challenge of desert runway resurfacing
    February 8, 2012
    Ferocious daytime temperatures can provide a tough challenge to construction firms working in desert conditions in Egypt's south. Despite the high daytime temperatures however, Egyptian contractor Orascom has managed to complete an airport project on budget and ahead of schedule, while meeting the client's tight specifications.
  • Meeting the challenge of desert runway resurfacing
    April 13, 2012
    Ferocious daytime temperatures can provide a tough challenge to construction firms working in desert conditions in Egypt's south. Despite the high daytime temperatures however, Egyptian contractor Orascom has managed to complete an airport project on budget and ahead of schedule, while meeting the client's tight specifications. The firm has just completed the project to revamp Suhag Airport in the south of the country. This airport now features a new runway, taxiways and aircraft hard standing, as well as n
  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia. The completion of this important route is requiring funding worth US$150 million, of which 72% is being delivered through loans from the European Investment
  • Runway resurfacing in Sardinia with Wirtgen machines
    December 7, 2017
    The fleet used comprised two Wirtgen W 210s and one W 200i, as well as two Wirtgen WR 2000 soil stabilisers. Located roughly 8 km north-west of the city of Alghero, Alghero-Fertilia Airport is one of three commercial airports on the Italian island, along with Cagliari Elmas and Olbia. Built as a military airport in the late 1930s, Alghero-Fertilia still occasionally handles military aircraft. However commercial flights represent its main traffic and as it serves the provinces of Sassari and Oristano, it is