Skip to main content

New plant offers productivity increase

A new asphalt plant has offered a major productivity and efficiency gain for a producer in the US. The privately-owned Tully Group has opted to replace two batch plants with a single large plant for its operation in the US state of Connecticut. The Tully Group’s Tully Construction Company has been a major asphalt producer/contractor in New York for many years and has had success in producing and placing RAP in the area. When the Tully Group purchased the Galasso Materials operation in East Granby, three b
September 24, 2018 Read time: 4 mins
A new Astec asphalt plant is allowing a contractor to increase the use of RAP

A new asphalt plant has offered a major productivity and efficiency gain for a producer in the US. The privately-owned Tully Group has opted to replace two batch plants with a single large plant for its operation in the US state of Connecticut.

The Tully Group’s Tully Construction Company has been a major asphalt producer/contractor in New York for many years and has had success in producing and placing RAP in the area. When the Tully Group purchased the Galasso Materials operation in East Granby, three batch plants were located at the quarry site and the firm decided to expand its operations in Connecticut.

The company opted to install a new 453tonne/hour High RAP Double Barrel XHR HMA plant at the East Granby quarry, shutting down two existing batch plants. Current permit guidelines require plants be located away from water sources, schools, and other sensitive areas. At the East Granby location, the Tully Group made a joint agreement with Connecticut's Department of Energy and Environmental Protection (CT DEEP) to surrender the operating permits for the two oldest plants on the site as part of CT DEEP’s approval to allow Tully to install the cleaner and more efficient 1250 Astec plant. Ken Tully manages the Tully Group’s asphalt production business and knew that technology capable of using recycled material should replace the two batch plants. The firm has been producing mixes with 60-70% RAP content on a daily basis in New York, where paving projects are now required to contain a minimum of 30% RAP to meet environmental guidelines. The use of stainless steel and an external mixer with a Double Barrel design were all-important features for the use of high RAP content in projects. For producing a 60% RAP mix, the initial 40% virgin aggregate has to be heated to a higher temperature to sufficiently heat the RAP without direct flame, as this could burn off some of the existing binder.

For its plant in Queens, Tully has typically used up to 60% RAP on private commercial projects that require a minimum of 50% RAP, according to Tully. For one city parking lot project that was designated a green drainage area, the company produced around 9,000tonnes of asphalt containing up to 60% RAP to meet the  requirements.

Currently, 80-90% of Tully’s asphalt work is for road agencies, with the remaining focused on commercial work. In New York the company is required to use 30% RAP on city streets, while in Connecticut it can use 15% RAP and up to 20% with specific engineer approval in all surface courses for all road agency work. But Tully says that as agencies realise the cost benefit of using more RAP, along with the environmental aspects of recycling more material, it expects to see higher percentages of RAP being used.

The new plant was run at approximately 80% of capacity this past season and supplied most of the material for the firm’s four paving crews in the area. With six 272tonne storage silos, the firm plans for the plant to produce 90% of the asphalt from its East Granby site. Tully added that 80% of all production from the facility is for its own paving crews, with the remaining 20% sold to independent contractors. And with three recycling bins, the firm is set up to incorporate as much RAP as agencies and its other customers will allow.

Other major components supporting the mixer drum, fired by a Phoenix Talon combination gas/oil burner, include a seven-compartment cold feed system, a dual deck scalping screen and twin shaft asphalt mixer. They also include a Pulse Jet Baghouse, a low-profile truck scale, a pilot control centre equipped with the Total Control II-HMA PLC Control System, a Heatec 2 gas/oil heater, and three vertical insulated asphalt tanks.

For more information on companies in this article

Related Content

  • Massenza’s bespoke solution for desert emulsion plant
    July 4, 2023
    In late 2022, one of Massenza’s long-standing customers approached the bitumen equipment manufacturer with a special request: it needed a high-capacity emulsion plant which would be located in a remote area of the Middle East. Additionally, the plant needed enhanced levels of flexibility, security and safety.
  • Bauma exhibit of model of Astec’s M-Pack asphalt facility
    January 6, 2017
    Astec, an Astec Industries company, and one of North America’s leading manufacturers of state-of-the-art asphalt plants, will exhibit as part of the Astec Industries stand. On display will be a one-eighth scale model of a complete Astec M-Pack relocatable asphalt facility. Since its debut at ConExpo 2005, the award-winning Astec model has garnered acclaim by putting an entire asphalt plant on a human scale with remarkable attention to detail. “The innovative M-Pack facility features the Astec exclusive Doub
  • Innovative high performance asphalt technology
    February 14, 2012
    An authority replaces container wharf pavement damaged by forklift loads in world's first commercial use of high-performance asphalt base course. By Paul Fournier
  • Sila's Sandvik Thai success
    July 17, 2012
    The Sila Sanon limestone quarry in Thailand is playing a key role in providing high quality aggregates for the growing Thai construction industry.Recently the family-owned operation has invested in a full range of crushing and screening plant supplied by Sandvik Construction’s dealer in Thailand, the William Wong Group, and the quarry is now able to supply over 200,000tonnes of accurately sized materials on a monthly basis. The Sila Sanon Quarry in Saraburi Province, just over 100km north of the capital Ba