Skip to main content

MB R500 crusher drum cutter goes the course in Corsica

An MB Crusher MB R500 drum cutter has been helping shape the Aldilonda walkway in Bastia, at the city’s citadel ramparts on the seafront.
February 7, 2020 Read time: 1 min
Cutting it in Corsica: MB’s R500 drum cutter working on the cliffside

The site if full of technical constraints but the MB R500 was chosen because of its compact size and ability to be mounted on a Bobcat E55 crawler excavator.

Access to work on the Aldilonda walkway is difficult, and hanging onto the cliffside has sometimes been called an acrobat’s job. Moreover, along the 450m, the rocks beneath the citadel’s  walls are not homogeneous -  operators don’t know what they will encounter.

The R500 is the smallest model of MB’s drum cutters but extremely versatile as it can be fully accessorised with add-ons such as a dust suppressor, drum cover and a cutting depth adjustment. It weighs only 300kg and can be installed on mini and midi excavators from 3-12tonnes as well as on skid steer loaders. Its powerful cutter head has a diameter of 500mm and grinds with extreme precision. Its drum can be replaced on site in less than an hour.

The MB R500 is exceeding all expectation and making 3m of linear progress every day on average, grinding away rock to make a clear and level path. The walkway is scheduled to be open in the first quarter of 2020.

For more information on companies in this article

Related Content

  • Indeco reveals new system for selecting tunnelling methods
    January 6, 2017
    Italian hydraulic breaker manufacturer Indeco is introducing a new approach to selecting tunnelling methods. The firm says that this has been developed in response to a tunnelling industry that is too-ready to select tunnel boring machines (TBMs).
  • Indeco reveals new system for selecting tunnelling methods
    April 22, 2015
    Italian hydraulic breaker manufacturer Indeco is introducing a new approach to selecting tunnelling methods. The firm says that this has been developed in response to a tunnelling industry that is too-ready to select tunnel boring machines (TBMs).
  • Italian stabilization efficiency from FAE
    March 18, 2016
    Italian firm FAE continues to develop its recycling technology, now offering two stabiliser packages for large and small operations. The smaller SSM and SSM/HP units operate with working depths down to 400mm. Meanwhile the larger SSH unit has a working width of 2.5m, suits towing machines with power outputs from 120-300kW, and can handle working depths down to 500mm. A key development is the firm’s innovative automatic injection system (AIS), which now offers a more efficient and effective mixing of wate
  • CTB forges ahead with Naylor Denlok pipes under A556 upgrade
    September 30, 2016
    Recent trenchless installation of surface water drainage pipes was used underneath a UK road improvement scheme to allow highway upgrades to proceed unimpeded The A556 Knutsford to Bowdon Improvement Scheme, being undertaken by Costain for its client Highways England, is valued between €197 million and nearly €265 million. The 7.5km section will transform the A556 trunk road between the towns of Knutsford and Bowdon into a modern dual carriageway. Costain will also be making the existing A556 into a single