Skip to main content

MB R500 crusher drum cutter goes the course in Corsica

An MB Crusher MB R500 drum cutter has been helping shape the Aldilonda walkway in Bastia, at the city’s citadel ramparts on the seafront.
February 7, 2020 Read time: 1 min
Cutting it in Corsica: MB’s R500 drum cutter working on the cliffside

The site if full of technical constraints but the MB R500 was chosen because of its compact size and ability to be mounted on a Bobcat E55 crawler excavator.

Access to work on the Aldilonda walkway is difficult, and hanging onto the cliffside has sometimes been called an acrobat’s job. Moreover, along the 450m, the rocks beneath the citadel’s  walls are not homogeneous -  operators don’t know what they will encounter.

The R500 is the smallest model of MB’s drum cutters but extremely versatile as it can be fully accessorised with add-ons such as a dust suppressor, drum cover and a cutting depth adjustment. It weighs only 300kg and can be installed on mini and midi excavators from 3-12tonnes as well as on skid steer loaders. Its powerful cutter head has a diameter of 500mm and grinds with extreme precision. Its drum can be replaced on site in less than an hour.

The MB R500 is exceeding all expectation and making 3m of linear progress every day on average, grinding away rock to make a clear and level path. The walkway is scheduled to be open in the first quarter of 2020.

For more information on companies in this article

Related Content

  • Record year for Doosan Bobcat in EMEA
    March 19, 2020
    Doosan Bobcat benefited from a record year in its EMEA territories.
  • The future of autonomy
    January 13, 2023
    The panel of experts from Trimble and Dynapac discussed where the construction industry is on the path to autonomy at present, where it is heading, and Trimble’s overall corporate vision for the future. Trimble’s philosophy is that machine autonomy is about more than just controlling the machine. To move the industry forward, autonomy solutions must also turn real-time data into real-time information to optimise and coordinate the jobsite of the future according to Trimble. Providing full access to that data presents a challenge, but can be achieved.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Wacker Neuson builds on Caterpillar link
    November 14, 2012
    Bolstered by building machines for Caterpillar and high demand for its VDS equipped excavators, Wacker Neuson has greatly increased its compact equipment building capability in Linz - Nick Johnson reports At a time when some other construction equipment makers have still scaled back their operations following the global economic crisis, Wacker Neuson has been busy building new facilities and increasing its production capacity. Last month the company officially opened its new compact equipment production fac