Skip to main content

Material reduction process in Mexico

October 9, 2019 Read time: 1 min

A quarrying operation in Mexico has switched to using a drum cutting attachment supplied by 283 MB Crusher, instead of using explosives for blasting. The customer says that this change in working operations has delivered major benefits in terms of efficiency. The company is now able to deliver a more consistent grade of material in terms of both quality and size. Using the drum cutter attachment ensures that there are lower waste fines produced, as well as no over-sized material requiring secondary breaking at additional cost. At the same time, the quarry floor is no more regular and even, reducing wear and tear on loading and hauling equipment that will likely result in reduced maintenance costs for crawler tracks and tyres.

Safety and security needs have also been addressed by removing the explosives from the working site. There is far less risk of flyrock from the working area, while there is a reduced need for site security now that explosives are no longer used. Noise and disturbance to the surrounding area has also been reduced considerably, without the need for blasting.

For more information on companies in this article

Related Content

  • New crushing and screening developments abounded at Hillhead
    October 3, 2014
    A wide array of crushing, screening and materials handling technologies have been introduced in recent months - Mike Woof writes The manufacturers of crushing and screening products have been developing an array of new systems to optimise production. The recent Hillhead show in the UK was the launch point for a number of these new products, although firms from all over the world have also been developing new designs. Productivity and wear life are two performance factors seeing major benefits from innovatio
  • Helsinki's tunnel project
    April 11, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • Helsinki's tunnel project
    May 9, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof. A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • New developments in road recycling and milling
    June 11, 2019
    New developments in road recycling and milling will allow contractors to remove old surfaces more quickly and efficiently – Mike Woof reports