Skip to main content

Marini mobile asphalt plant XPRESS 2500 P at Reykjavik Airport

Iceland, being a volcanic island and still active, must import aggregates and bitumen for road construction. The island’s 104,000km² and its 333,000 inhabitants are susceptible to daily seismic activity of some kind. However, airline passengers, either visiting the country as tourist or in transit, are increasing by around 20% per year so good airport services are essential. As such, Colas is resurfacing the main runway and constructing a third strip and contracting other road works. The highway network i
May 17, 2017 Read time: 3 mins
Colas operates Marini’s XPRSS 2500 P for runway duty
Iceland, being a volcanic island and still active, must import aggregates and bitumen for road construction.


The island’s 104,000km² and its 333,000 inhabitants are susceptible to daily seismic activity of some kind.

However, airline passengers, either visiting the country as tourist or in transit, are increasing by around 20% per year so good airport services are essential. As such, 184 Colas is resurfacing the main runway and constructing a third strip and contracting other road works.

The highway network is shaped around the natural features of a difficult and constantly changing – sometimes abruptly - environment. Around 60% of the road system is not asphalted while 35% has a single-surface treatment. Only 5% of the road network consists of traditional hot asphalt.

In 1987, Colas, a global road building company took the decision at its Denmark offices to establish an operational centre in Iceland. Now, of the 350,000tonnes of asphalt produced on the island annually, around 250,000tonnes are provided by Colas.

In the second half of 2015, Colas Denmark, including the Icelandic operations, conducted a technical-commercial market survey, aimed at pinpointing a new plant whose first task would be to re-qualify and expand Reykjavik’s airport. The work was to act as a benchmark for the company’s work on other building and maintenance projects on the island.

Fundamental for future asphalt plant on the island was good mobility on wheels, for quick and easy transfer but over rough terrain. The plant also had to have rapid installation to permit quick, low-cost relocation without the need of often unavailable heavy-lifting equipment.

Capacity of the plant had to be more than 200tonnes/hour to enable production in a short period of time. Also required was sufficient storage to permit uninterrupted production.

Finally, resistance, quality and reliability were important for an asphalt plant to ensure continuous production. Plant servicing in Iceland, both from the point of view of technical support and the supply of necessary spare parts, can be a problem.

The choice of a 273 Marini mobile plant, a 2500 P model from the XPRESS range, was the choice, according to Colas. It could produce 200tonnes/hour with 5% moisture in virgin aggregates. Also, all components were on individually wheel-mounted units with its own braking system to meet road circulation standards. Remaining components are housed and transported in a specific container.

The plant is self-erecting by way of a hydraulic system that lifts the main trailer into its working position. A small electric winch fitted onto the main trailer positions the screens and elevator into their final work stations. Structural integrity is assured through such initiatives as Marini Endurance, a high-wearing elevator with resistant REX chain.

In May 2016 Marini finally moved the machine out of the company workshop in Alfonsine, north-east Italy, and onto a ship at nearby Ravenna for its journey to Iceland. After a four-week sea journey and two weeks of testing, the unit was ready for work.

The first job awaiting the new XPRESS 2500 P has been the resurfacing of the new runway at Reykjavik airport, around 50km from the capital city and an important European tourist flight centre.

For more information on companies in this article

Related Content

  • Astec’s Azerbaijan asphalt application
    June 9, 2015
    In Azerbaijan an Astec batching plant is said to be giving a major contractor an advantage over its competition The firm, Aztikintiyol, is one of the leading producers of aggregates and hot-mix asphalt in Azerbaijan and decided to expand its operations into the southern regions of the country. The need for asphalt in this area was growing as there is massive infrastructure development close to the border with neighbouring Iran taking place. However a simple plant was not suitable as the firm required
  • Safety measures aid workzone accident reduction
    February 20, 2012
    Everyone connected with the highway industry is involved in the efforts to cut down the number of work zone accidents. Patrick Smith reports. A few months ago, as road work resumed on America's highways and bridges, US Transportation Secretary Ray LaHood called on drivers to use extra caution in work zones. At the same time he commended the success in reducing overall roadway fatalities in each of the last seven years.
  • Nigerian asphalt producer increasing capacity with Sandvik plant
    June 30, 2014
    In Nigeria a major asphalt producer is increasing production capacity to cope with growing demand for its materials Nigeria is developing its road and highway network, which has triggered greater demand for quality aggregates and asphalt for construction. Producer Asphalt Unity Construction is now meeting this demand with its purchase of new mobile equipment from Sandvik Construction.
  • More short-tails from Komatsu
    April 30, 2024

    With the launch of the PW168-11 and PW198-11, Komatsu reports it has rounded up the operating weights of its wheeled excavator range to 20 tonnes.

    Komatsu says that the new machines - at 16 and 20 tonnes - are compact and easy to transport yet powerful and versatile.

    There is no need for a special low-bed trailer. With a low transportation height of just 3.1m, they can be transported on standard low-bed trailers with a loading height of up to 4m. The short rear overhang of 1.85m (PW168-11) or 1.9m (PW198-11) is ideal for narrow construction sites.