Skip to main content

Marini mobile asphalt plant XPRESS 2500 P at Reykjavik Airport

Iceland, being a volcanic island and still active, must import aggregates and bitumen for road construction. The island’s 104,000km² and its 333,000 inhabitants are susceptible to daily seismic activity of some kind. However, airline passengers, either visiting the country as tourist or in transit, are increasing by around 20% per year so good airport services are essential. As such, Colas is resurfacing the main runway and constructing a third strip and contracting other road works. The highway network i
May 17, 2017 Read time: 3 mins
Colas operates Marini’s XPRSS 2500 P for runway duty
Iceland, being a volcanic island and still active, must import aggregates and bitumen for road construction.


The island’s 104,000km² and its 333,000 inhabitants are susceptible to daily seismic activity of some kind.

However, airline passengers, either visiting the country as tourist or in transit, are increasing by around 20% per year so good airport services are essential. As such, 184 Colas is resurfacing the main runway and constructing a third strip and contracting other road works.

The highway network is shaped around the natural features of a difficult and constantly changing – sometimes abruptly - environment. Around 60% of the road system is not asphalted while 35% has a single-surface treatment. Only 5% of the road network consists of traditional hot asphalt.

In 1987, Colas, a global road building company took the decision at its Denmark offices to establish an operational centre in Iceland. Now, of the 350,000tonnes of asphalt produced on the island annually, around 250,000tonnes are provided by Colas.

In the second half of 2015, Colas Denmark, including the Icelandic operations, conducted a technical-commercial market survey, aimed at pinpointing a new plant whose first task would be to re-qualify and expand Reykjavik’s airport. The work was to act as a benchmark for the company’s work on other building and maintenance projects on the island.

Fundamental for future asphalt plant on the island was good mobility on wheels, for quick and easy transfer but over rough terrain. The plant also had to have rapid installation to permit quick, low-cost relocation without the need of often unavailable heavy-lifting equipment.

Capacity of the plant had to be more than 200tonnes/hour to enable production in a short period of time. Also required was sufficient storage to permit uninterrupted production.

Finally, resistance, quality and reliability were important for an asphalt plant to ensure continuous production. Plant servicing in Iceland, both from the point of view of technical support and the supply of necessary spare parts, can be a problem.

The choice of a 273 Marini mobile plant, a 2500 P model from the XPRESS range, was the choice, according to Colas. It could produce 200tonnes/hour with 5% moisture in virgin aggregates. Also, all components were on individually wheel-mounted units with its own braking system to meet road circulation standards. Remaining components are housed and transported in a specific container.

The plant is self-erecting by way of a hydraulic system that lifts the main trailer into its working position. A small electric winch fitted onto the main trailer positions the screens and elevator into their final work stations. Structural integrity is assured through such initiatives as Marini Endurance, a high-wearing elevator with resistant REX chain.

In May 2016 Marini finally moved the machine out of the company workshop in Alfonsine, north-east Italy, and onto a ship at nearby Ravenna for its journey to Iceland. After a four-week sea journey and two weeks of testing, the unit was ready for work.

The first job awaiting the new XPRESS 2500 P has been the resurfacing of the new runway at Reykjavik airport, around 50km from the capital city and an important European tourist flight centre.

For more information on companies in this article

Related Content

  • Special mixes produced for a race track in Indonesia
    March 4, 2022
    International motorcycle racing has returned to Indonesia with help from asphalt plants supplied by Lintec & Linnhoff after a 24-year hiatus
  • Asphalt airport runway refurbishment
    February 17, 2012
    Swedish contractor Peab Asfalt generally works on major road and highway projects in the inland portion of the country. However the company has shown itself able to take on a considerable challenge, by repaving an airport runway.
  • Meeting the challenge of desert runway resurfacing
    February 8, 2012
    Ferocious daytime temperatures can provide a tough challenge to construction firms working in desert conditions in Egypt's south. Despite the high daytime temperatures however, Egyptian contractor Orascom has managed to complete an airport project on budget and ahead of schedule, while meeting the client's tight specifications.
  • Meeting the challenge of desert runway resurfacing
    April 13, 2012
    Ferocious daytime temperatures can provide a tough challenge to construction firms working in desert conditions in Egypt's south. Despite the high daytime temperatures however, Egyptian contractor Orascom has managed to complete an airport project on budget and ahead of schedule, while meeting the client's tight specifications. The firm has just completed the project to revamp Suhag Airport in the south of the country. This airport now features a new runway, taxiways and aircraft hard standing, as well as n